Tender Details

Particulars Details
Title
Btps Chp Cold Vulcanization Belt Joints, Pulley Lagging For The 1400mm Bw Conveyors, Bcn 4 A/B, Bcn 5 A/B, Bcn 6 A/B, 7 A/B And Bcn 10 Of Conveyors As And When Required In Mm Iii Sub Division Of Mm/Chp/Btps From Actual Date Of Commencement Of Work To 31.03.2027
Description
Btps Chp Cold Vulcanization Belt Joints, Pulley Lagging For The 1400mm Bw Conveyors, Bcn 4 A/B, Bcn 5 A/B, Bcn 6 A/B, 7 A/B And Bcn 10 Of Conveyors As And When Required In Mm Iii Sub Division Of Mm/Chp/Btps From Actual Date Of Commencement Of Work To 31.03.2027
Organisation TELANGANA POWER GENERATION CORPORATION LIMITED-CE CONSTRUCTION BTPS
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value 10.39 Lakh
Place Telangana
Link Login to view
Start Date October 06, 2026 02:30
End Date
Open 22/10/2026

10 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Read more
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.

Read more
Ichp- provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in stage-iii conveyors.

Ichp- provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in stage-iii conveyors.&amp#x0d &amp#x0d

Read more
Hold back assemblies for conveyors-3,4 7a/b and 8a/b gear boxes for mm-chp

Hold back assemblies for the conveyors-3,4, 7a/b and 8a/b gear boxes for mm-chp

Read more
Repair of conveyors drums of od 500, 630 of 1400mm and 1600mm length of chp, bharatpur ocp

Repair of conveyors drums of od 500, 630 of 1400mm and 1600mm length of chp, bharatpur ocp

Read more
Ichp-provision of rubber lagging over the pulleys in 1000mm, 1200mm, 1400mm width conveyors in sub dn.ii internal coal handling system.

Ichp-provision of rubber lagging over the pulleys in 1000mm, 1200mm, 1400mm width conveyors in sub dn.ii internal coal handling system.

Read more
Procurement of conveyor-belt of different specifications required for various conveyors installed at chp, btps.

Procurement of conveyor-belt of different specifications required for various conveyors installed at chp, btps.

Read more
Procurement of conveyor-belt of different specifications required for various conveyors installed at chp, btps.

Procurement of conveyor-belt of different specifications required for various conveyors installed at chp, btps.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise