Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tggenco Ytps Be1 Collection And Testing Of Oil Samples Pertaining To Bm I Division From Actual Date Of Commencement Of Work To 31.03.2027
|
| Description |
Tggenco Ytps Be1 Collection And Testing Of Oil Samples Pertaining To Bm I Division From Actual Date Of Commencement Of Work To 31.03.2027
|
| Organisation | TELANGANA POWER GENERATION CORPORATION LIMITED-Chief Engineer Civil Construction YTPS |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 2.87 Lakh |
| Place | Telangana |
| Link | Login to view |
| Start Date | September 29, 2026 00:00 |
| End Date |
Closing soon
14/10/2026
1 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreTggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Tggenco-ytps(5x800mw)-switchyard transformer yard division-testing of transformer oil samples of various power transformers as and when required during the fy 2026-27
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreTggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage
Tggenco - rts-b- providing of insurance coverage for the operational, non-operational and store items and obsolete spares and burglary including theft policy for plant assets of 1x62.5 mw- rts-b unit, ramagundam for a period of one year from the actual date of commencement of insurance coverage
Read moreCc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027
Read moreTggenco-ytps-upkeeping and maintenance of toilets in ash handling plant structures including silos at ytps from 01.04.2026 or actual date of utilization to 31.03.2027
Tggenco-ytps-up keeping and maintenance of toilets in ash handling plant structures including silos of yadadri thermal power station at veerlapalem(v), dameracherla(m), nalgonda dist from 01.04.2026 or actual date of utilization to 31.03.2027 for the fy 2026-27
Read moreTggenco-ytps-up keeping of toilets, urinals and maintenance of sewage pipe line and manholes at office sheds and store office building at ytps from 01.04.2026 or actual date of commencement of work to 31.03.2027.
Tggenco-ytps-up keeping of toilets, urinals and maintenance of sewage pipe lines and manholes at various locations in office sheds and store office building of yadadri thermal power station, at veerlapalem(v), dameracherla(m) in nalgonda dist from 01.04.2026 or actual date of commencement of work to 31.03.2027
Read moreTggenco-ytps-up keeping of toilets, urinals and maintenance of sewage pipe lines and manholes at power house 1 and 2, esp control building-1 and 2 and service building 1 at ytps from 01.04.2026 or actual date of commencement of work to 31.03.2027
Tggenco-ytps(5x800mw)-up keeping of toilets, urinals and maintenance of sewage pipe lines and manholes etc at power house-1 and 2, esp control building-1 and 2 and service building-1 at yadadri thermal power station, veerlapalem (v), dameracherla (m), nalgonda district from 01.04.2026 or actual date of commencement of work to 31.03.2027.
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreof your Industry type