Tender Details
Particulars | Details |
---|---|
Title |
Horticulture Work Creation And One Year Maintenance In Connection With Development Of Project Utsadhara To Develop The River Bank Of Gandhighat Barrackpore
|
Description |
Horticulture Work Creation And One Year Maintenance In Connection With Development Of Project Utsadhara To Develop The River Bank Of Gandhighat Barrackpore
|
Organisation | WEST BENGAL FOREST DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 3.55 Lakh |
Tender Value | |
Place | Gandhighat, Barrackpore |
Link |
AAAAAAAAAA Login to view |
Start Date | April 23, 2025 20:30 |
End Date |
14/05/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreDevelopment and maintenance of horticulture work in shastri park train depot, prakriti metro park, transit hostel, dmra, boys trainee hostel, shastri park quarters and depot approach roads at shastri park for 03 years.
Development and maintenance of horticulture work in shastri park train depot, prakriti metro park, transit hostel, dmra, boys trainee hostel, shastri park quarters and depot approach roads at shastri park for 03 years.
Read moreMaintenance of civil work addition, alteration modification of various building, viaduct and stations from qutub minar to arjangarh metro stations including qutub minar ramp and sultanpur depot in line-2. (for 3 years).
Maintenance of civil work addition, alteration modification of various building, viaduct and stations from qutub minar to arjangarh metro stations including qutub minar ramp and sultanpur depot in line-2. (for 3 years).
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreIndependent engineer services for development, operations and maintenance of ropeway from sonprayag to kedarnath in the state of uttarakhand on dbfot mode
Independent engineer services for development, operations and maintenance of ropeway from sonprayag to kedarnath in the state of uttarakhand on dbfot mode
Read moreSupply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Supply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Read moreSs of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Read moreShort term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreof your Industry type