Tender Details
About Tender
🛣️ Rfp For Nh 330 D Widening And Strengthening Project 🛣️ The Ministry Of Road Transport And Highways, Central Government, Has Issued A Request For Proposal (Rfp) For The Widening And Strengthening Of National Highway 330 D (Sitapur To Kurain Section) From Km 0.000 To Km 38.853. This Project Aims To Upgrade The Highway To A Two Lane Configuration With Paved Shoulders Under The Engineering, Procurement, And Construction (Epc) Mode. 📅 Submission Deadline: May 22, 2024, 11:00 Am Tender Fee: Inr 40,000 Earnest Money Deposit (Emd): Inr 3.52 Crore Eligible Bidders Are Invited To Submit Detailed Proposals, Including Technical And Financial Bids, In Accordance With The Project Specifications And Guidelines. Keywords: Rfp, Nh 330 D, Widening And Strengthening, Epc Mode, Ministry Of Road Transport And Highways, Infrastructure Project, Tender, Emd, Uttar PradeshParticulars | Details |
---|---|
Title |
Rfp For The Work Of Widening And Strengthening From Km 0.000 To Km 38.853 Of Nh 330 D (Sitapur To Kurain Section) To Two Lane With Paved Shoulder Configuration Under Epc Mode In The State Of Uttar Pradesh.
|
Description |
Rfp For The Work Of Widening And Strengthening From Km 0.000 To Km 38.853 Of Nh 330 D (Sitapur To Kurain Section) To Two Lane With Paved Shoulder Configuration Under Epc Mode In The State Of Uttar Pradesh.
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 40000 |
EMD | 3.52 Crore |
Tender Value | |
Place | SITAPUR |
Link |
AAAAAAAAAA Login to view |
Start Date | April 27, 2023 00:25 |
End Date |
21/05/2025 ( 31 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConsultancy services for ae for supervision of rehabilitation and up-gradation from design ch km 35.300 to km 65.740 of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode
Consultancy services for ae for supervision of rehabilitation and up-gradation from design ch km 35.300 to km 65.740 of nh-166g (gaganbawada to kale) to 2lps in the state of maharashtra on epc mode.
Read moreConsultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Read moreConstruction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode
Construction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreof your Industry type