🏭 Tender Announcement For Mtps I Tm Unit I Valve Replacement And Modification Project 🛠️ Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Mtps I Tm Unit I Project, Which Involves The Replacement Of Defective Valves And The Modification Of Existing 1inch Casing Drain Line Valves Into 2inch Valves, Along With The Change Of Eroded Drip Line Reducers, Expanders, Etc. At Mettur Thermal Power Station I / Mettur Dam. 📅 Bid Submission Deadline: April 23, 2024, 2:00 Pm Tender Fee: Inr 0 Emd: Inr 4300 This Project Requires A Detailed Understanding Of The Existing Infrastructure And The Ability To Implement Modifications With Precision And Efficiency. Interested Bidders Should Submit Their Proposals, Including Technical Specifications, Pricing, And Project Execution Timelines, By The Stipulated Deadline. Keywords: Tneb Limited, Mtps I Tm Unit I, Valve Replacement, Modification, Mettur Thermal Power Station I, Mettur Dam, Government Tender, Engineering Services, Power Sector
Particulars Details
Title
Mtps I Tm Unit I Replacing Of The Defective Valve Vdas 122 Modification Of Hpt Ipt Existing 1inch Casing Drain Line Valves Into 2inch Valves And Changing The Eroded Drip Line Reducers Expanders Etc
Description
Mtps I Tm Unit I Replacing Of The Defective Valve Vdas 122 Modification Of Hpt Ipt Existing 1inch Casing Drain Line Valves Into 2inch Valves And Changing The Eroded Drip Line Reducers Expanders Etc
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_428356_1
Reference
Number
CE / MTPS-I / SE / M-I / TM / OT.470 /2023-24
Tender Fee 0
EMD 4300
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=509349

Start Date February 21, 2024 16:30
End Date
Expired 23/04/2024

Expired 804 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps i tm unit iv replacing the defective valves vdas 122 dw 14 modification of hpt ipt existing 1 casing drain line valves into 2 valves changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line

Mtps i tm unit iv replacing the defective valves vdas 122 dw 14 modification of hpt ipt existing 1 casing drain line valves into 2 valves changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line

Read more
Mtps i tm unit iv replacing the defective valve vdas 122 eroded flash tank-i changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line vent line valves pipes bends by ibr non ibr

Mtps i tm unit iv replacing the defective valve vdas 122 eroded flash tank-i changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line vent line valves pipes bends by ibr non ibr

Read more
Mtps i tm unit ii changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective vdas 122 valve by ibr non ibr welding in unit ii during capital overha

Mtps i tm unit ii changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective vdas 122 valve by ibr non ibr welding in unit ii during capital overha

Read more
Mtps i tm unit i replacing of the defective hrh stub valve vdas 122 eroded hrh crh hp lp bypass drain line to flash tank ii connected headers and changing the eroded drip line reducers expanders bends of hd 1 2 14 15

Mtps i tm unit i replacing of the defective hrh stub valve vdas 122 eroded hrh crh hp lp bypass drain line to flash tank ii connected headers and changing the eroded drip line reducers expanders bends of hd 1 2 14 15

Read more
Mtps i tm unit ii changing the defective valves of ipt flange and stud heating line as 8 bfp rc 2a by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 and 2 drain line

Mtps i tm unit ii changing the defective valves of ipt flange and stud heating line as 8 bfp rc 2a by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 and 2 drain line

Read more
Mtps i tm unit iii replacing of the defective dw 73 74 vdas122 mc50 valves by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 inch and 2 inch drain line

Mtps i tm unit iii replacing of the defective dw 73 74 vdas122 mc50 valves by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 inch and 2 inch drain line

Read more
Mtps i tm unit ii transporting the valves from central store replacing the defective extraction steam to hp heaters 5 6 isolation valves es 5 es 6 mc 29 mc nrv deaerator floor bfp suction valves 2c ca 24 eroded drip line reducers

Mtps i tm unit ii transporting the valves from central store replacing the defective extraction steam to hp heaters 5 6 isolation valves es 5 es 6 mc 29 mc nrv deaerator floor bfp suction valves 2c ca 24 eroded drip line reducers

Read more
Ttps mech ii tm i unit iii overhauling of hpt ipt control valves and cam shaft assemblies etc during annual overhaul 2024 2025

Ttps mech ii tm i unit iii overhauling of hpt ipt control valves and cam shaft assemblies etc during annual overhaul 2024 2025

Read more
Mtps i tm unit i replacing the existing defective constant and variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during unit i aoh 2024

Mtps i tm unit i replacing the existing defective constant and variable load hangers by new load hangers after providing necessary scaffolding supporting arrangements during unit i aoh 2024

Read more
Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves

Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves