Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Tm I Removal And Re Insulation Of Hp Ip Control Valves Gland Steam Pipes Esv Iv And Hpt Ipt Transfer Pipe Lines During Breakdown Maintenance Work Of Main Turbine In Unit I To Iv For The Period Of One Year During 2026 27 As And When Required
|
| Description |
Mtps I Tm I Removal And Re Insulation Of Hp Ip Control Valves Gland Steam Pipes Esv Iv And Hpt Ipt Transfer Pipe Lines During Breakdown Maintenance Work Of Main Turbine In Unit I To Iv For The Period Of One Year During 2026 27 As And When Required
|
| Organisation | TNEB Limited | TANGEDCO | CE-MTPS-I - TANGEDCO | SE-Mechanical Maintenance I-MTPS-I - TANGEDCO |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | 3300 |
| Tender Value | - |
| Place | Tamil Nadu |
| Link | Login to view |
| Start Date | October 07, 2026 14:30 |
| End Date |
Open
21/10/2026
8 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mechii tm i unitiii inspection overhauling of hpt ipt control valves cam shaft assemblies and turbine bearings during the forthcoming annual overhaul
Ttps mechii tm i unitiii inspection overhauling of hpt ipt control valves cam shaft assemblies and turbine bearings during the forthcoming annual overhaul
Read moreMtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Read moreMtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Mtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Read moreMtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreMtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re insulation to pipe lines and valves hp heaters gland steam cooler etc
Mtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re insulation to pipe lines and valves hp heaters gland steam cooler etc
Read moreMtps i tm i breakdown maintenance work in main turbine its auxiliaries in unit i to iv for a period of one year during 2024 25 as and when required basis
Mtps i tm i breakdown maintenance work in main turbine its auxiliaries in unit i to iv for a period of one year during 2024 25 as and when required basis
Read moreMtps i tm i breakdown maintenance work in main turbine its auxiliaries in unit i to iv for a period of one year during 2023 24 as and when required basis
Mtps i tm i breakdown maintenance work in main turbine its auxiliaries in unit i to iv for a period of one year during 2023 24 as and when required basis
Read moreMtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly cleaning of strainer assembly and cooling water lines of esv iv during aoh 2024 25
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly cleaning of strainer assembly and cooling water lines of esv iv during aoh 2024 25
Read moreof your Industry type