Tender Details

Particulars Details
Title
Mtps I Tm I Breakdown Maintenance Work In Main Turbine Its Auxiliaries In Unit I To Iv For A Period Of One Year During 2024 25 As And When Required Basis
Description
Mtps I Tm I Breakdown Maintenance Work In Main Turbine Its Auxiliaries In Unit I To Iv For A Period Of One Year During 2024 25 As And When Required Basis
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_503100_1
Reference
Number
CE / MTPS-I / SE / M-I / TM /OT. 265 / 2024-25
Tender Fee 0
EMD 14500
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=598326
Start Date November 21, 2024 00:00
End Date

04/12/2024 ( Expired 172 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Providing pa system, serial lighting and lighting arrangement in connection with conducting various official functions on as and when required basis for a period of one year and extendable for further period of one year

Scope of work the contractor is ready to install the pa system, serial lighting and lighting arrangement within the port premises on an as and when required basis rate contract basis during the contract period of one year and extendable for further

Read more
Annual rate contract for attending emergent/ breakdown mechanical maintenance jobs of amm-iii plant on as and when required basis for a period of one year

Annual rate contract for attending emergent/ breakdown mechanical maintenance jobs of amm-iii plant on as and when required basis for a period of one year

Read more
Nctps i se mi circle turbine maintenance division annual maintenance work for the year 25 26 specification no 18 25 26

Nctps i se mi circle amc 25 26 tm dn unit i ii iii attending prive maintenance and breakdown works etc in air compressors for a period from the date of handing over of site to 31 03 2026

Read more
Maintenance / erection of oh line as and when required basis for sur vihar, sangam vihar, vasant vihar, rcm colony, irb , cisf colony and 48 qtr. colony at township (bachra) under gm unit, piparwar area for a period of one year.

Maintenance / erection of oh line as and &#x0d when required basis for sur vihar, sangam &#x0d vihar, vasant vihar, rcm colony, irb , cisf &#x0d colony and 48 qtr. colony at township &#x0d (bachra) under gm unit, piparwar area for a &#x0d period of one year.

Read more
Annual rate contract for attending hot insulation with fixing of new aluminium sheets in various positions of boiler, pipeworks, vessels, valves etc. as and when required basis for a period of one year

Annual rate contract for attending hot insulation with fixing of new aluminium sheets in various positions of&#x0d boiler, pipeworks, vessels, valves etc. as and when required basis for a period of one year

Read more
Nctps i se mi circle turbine maintenance division repair and maintenance work for the year 25 26 specification no 14 25 26

Nctps i se mi circle r and m 24 25 tm dn replacement of defective 450 nb 600 nb butterfly valves and servicing of existing 450 nb 600 nb butterfly valves actuators etc in unit i ii iii during short shutdown period 2024 25

Read more
Charges for making ht/lt cable jointing work as and when required basis

Scope of work the contractor is ready to attend the cable fault and to make the cable joining work as and when required basis during the contract period of one year and extendable for further one year

Read more
Ramganj-lakhipur-daspara road (mdr) from chainage 6.00km to 8.00 km and 10.00 km - 11.00 km (in stretches) as emergent pre monsoon repairing and maintenance work under uttar dinajpur division pwd, during the year 2025-26.

Ramganj-lakhipur-daspara road (mdr) from chainage 6.00km to 8.00 km and 10.00 km - 11.00 km (in stretches) as emergent pre monsoon repairing and maintenance work under uttar dinajpur division pwd, during the year 2025-26.

Read more
Mtps i mill plant unit iv hard facing of vertical coal pipe 1mtr length after transition piece 24 nos in mill 4a to mill 4f during capital overhaul 2025 26

Mtps i mill plant unit iv hard facing of vertical coal pipe 1mtr length after transition piece 24 nos in mill 4a to mill 4f during capital overhaul 2025 26

Read more
Mtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26

Mtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26

Read more
Click Here to Download Dockets
of your Industry type