Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm I Removal And Re Insulation Of Hp Ip Control Valves Gland Steam Pipes Esviv And Hptipt Transfer Pipe Lines During Breakdown Maintenance Work Of Main Turbine In Unit I To Iv For The Period Of One Year During 2025 26 As And When Required
|
Description |
Mtps I Tm I Removal And Re Insulation Of Hp Ip Control Valves Gland Steam Pipes Esviv And Hptipt Transfer Pipe Lines During Breakdown Maintenance Work Of Main Turbine In Unit I To Iv For The Period Of One Year During 2025 26 As And When Required
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_530592_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 318 / 2024-25 |
Tender Fee | 0 |
EMD | 3300 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=631663 |
Start Date | March 07, 2025 00:20 |
End Date |
20/03/2025 ( Expired 75 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreMtps i bm unit i boiler pressure parts aoh 2025 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Mtps i bm unit i boiler pressure parts aoh 2025 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Read moreMtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Mtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Read moreAnnual rate contract for attending hot insulation with fixing of new aluminium sheets in various positions of boiler, pipeworks, vessels, valves etc. as and when required basis for a period of one year
Annual rate contract for attending hot insulation with fixing of new aluminium sheets in various positions of
 boiler, pipeworks, vessels, valves etc. as and when required basis for a period of one year
Read moreMtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26
Mtps i mill plant unit iv dismantling hard facing and assembling of 1 meter length coal pipes after moe mill outlet elbow in coal mill 4a to 4f during capital overhaul 2025 26
Read moreCarrying out annual overhauling of heat recovery steam generator hp, ip and lp water/steam system valves of various sizes, safety valves, stg and hrsg flash tank, ibd and cbd tanks, gland steam condenser, deaerator and feed water storage tank overhau
Carrying out annual overhauling of heat recovery steam generator hp, ip and lp water/steam system valves of various sizes, safety valves, stg and hrsg flash tank, ibd and cbd tanks, gland steam condenser, deaerator and feed water storage tank overhau
Read moreMtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Read moreMtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26
Mtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26
Read moreMtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during coh 2025 26
Mtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during coh 2025 26
Read moreMtps i tm stage i ii units i ii iii iv bfps bfbps ceps voith hydraulic couplings and hdps prive break down maintenance for a period of one year from the date of commencement of work
Mtps i tm stage i ii units i ii iii iv bfps bfbps ceps voith hydraulic couplings and hdps prive break down maintenance for a period of one year from the date of commencement of work
Read moreof your Industry type