Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm Unit Iv Removal And Re Insulation Of Hp Ip Control Valve Area Spindle Leak Off Lines Gland Steam Pipes Of Lp Front Rear In Main Turbine During Annual Maintenance Work 2024 25
|
Description |
Mtps I Tm Unit Iv Removal And Re Insulation Of Hp Ip Control Valve Area Spindle Leak Off Lines Gland Steam Pipes Of Lp Front Rear In Main Turbine During Annual Maintenance Work 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_463142_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 97 / 2024-25 |
Tender Fee | 0 |
EMD | 1200 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=550404 |
Start Date | July 16, 2024 14:30 |
End Date |
22/07/2024 ( Expired 274 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ktps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026-reg
Ktps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreTtps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Read moreTtps mech ii tm ii removal and refixing of insulation in turbine casing valves and allied pipe lines in unit iv v for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm ii removal and refixing of insulation in turbine casing valves and allied pipe lines in unit iv v for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii tm ii kwu turbine unit iv v breakdown maintenance works in condenser hpbp valve lpt diaphragm and attending high pressure steam pipe lines punctures for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm ii kwu turbine unit iv v breakdown maintenance works in condenser hpbp valve lpt diaphragm and attending high pressure steam pipe lines punctures for the period from 01 04 2025 to 31 03 2026
Read moreProcurement of spares for main turbine gland steam supply and leak off valve actuators in unit i and ii
Procurement of spares for main turbine gland steam supply and leak off valve actuators in unit i and ii
Read moreTn-16082 supply of complete seal stem control valve and leak off control valve with pneumatic actuators for turbine gland seal system in unit 3 and 4 of kstps, kota
Supply of complete seal stem control valve and leak off control valve with pneumatic actuators for turbine gland seal system in unit 3 and 4 of kstps, kota
Read moreMtps i tm lifting of spare hp ip lp turbine rotors from rotor box rotating 180 degree and kept in rotor box etc during 2024 25
Mtps i tm lifting of spare hp ip lp turbine rotors from rotor box rotating 180 degree and kept in rotor box etc during 2024 25
Read moreMtps i tm i breakdown maintenance work in main turbine its auxiliaries in unit i to iv for a period of one year during 2024 25 as and when required basis
Mtps i tm i breakdown maintenance work in main turbine its auxiliaries in unit i to iv for a period of one year during 2024 25 as and when required basis
Read moreMtps tm i overhauling load testing and certification of 15 nos chain blocks of various capacities available in the area of main oil tanks turbine lub oil coolers and seal oil coolers in unit i to iv during 2024 25
Mtps tm i overhauling load testing and certification of 15 nos chain blocks of various capacities available in the area of main oil tanks turbine lub oil coolers and seal oil coolers in unit i to iv during 2024 25
Read moreof your Industry type