Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm I Removal And Re Insulation Of Hp Ip Control Valves Gland Steam Pipes Esv Iv And Hpt Ipt Transfer Pipe Lines During Breakdown Maintenance Work Of Main Turbine In Unit I To Iv
|
Description |
Mtps I Tm I Removal And Re Insulation Of Hp Ip Control Valves Gland Steam Pipes Esv Iv And Hpt Ipt Transfer Pipe Lines During Breakdown Maintenance Work Of Main Turbine In Unit I To Iv
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_412278_1 |
Reference Number |
CE /MTPS-I/ SE/ M-I /TM / OT. 365 / 2023-24 |
Tender Fee | 0 |
EMD | 1200 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=490576 |
Start Date | January 23, 2024 22:00 |
End Date |
06/02/2024 ( Expired 487 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreMtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Mtps i oandahs unit iii iv ash handling pump house stage ii dismantling of worn out suction pipe lines bends and grills in ash slurry sump iii and iv fabrication and erection of 300nb m s suction pipes and bends in the suction lines
Read moreMtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Read moreMtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26
Mtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26
Read moreMtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Read moreMtps i tm i unit i annual maintenance work in main turbine and its auxiliaries during 2025 26
Mtps i tm i unit i annual maintenance work in main turbine and its auxiliaries during 2025 26
Read moreMtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Mtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Read moreMtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Read moreMtps i tm unit i complete overhauling of hp bypass lp bypass spray valves oil supply unit during aoh 2025 2026
Mtps i tm unit i complete overhauling of hp bypass lp bypass spray valves oil supply unit during aoh 2025 2026
Read moreThermal insulation of steam lines feed water lines lphs hphs valves nrvs during capital overhauling of turbine of unit no 6 2x250 mw ptpp parichha
Thermal insulation of steam lines feed water lines lphs hphs valves nrvs during capital overhauling of turbine of unit no 6 2x250 mw ptpp parichha
Read moreof your Industry type