Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Tm I Removal And Re Insulation Of Hp Ip Control Valves Gland Steam Pipes Esv Iv And Hpt Ipt Transfer Pipe Lines During Breakdown Maintenance Work Of Main Turbine In Unit I To Iv
|
| Description |
Mtps I Tm I Removal And Re Insulation Of Hp Ip Control Valves Gland Steam Pipes Esv Iv And Hpt Ipt Transfer Pipe Lines During Breakdown Maintenance Work Of Main Turbine In Unit I To Iv
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_412278_1 |
|
Reference Number |
CE /MTPS-I/ SE/ M-I /TM / OT. 365 / 2023-24 |
| Tender Fee | 0 |
| EMD | 1200 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=490576 |
| Start Date | January 23, 2024 22:00 |
| End Date |
Expired
06/02/2024
Expired 981 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreTtps mechii tm i unitiii inspection overhauling of hpt ipt control valves cam shaft assemblies and turbine bearings during the forthcoming annual overhaul
Ttps mechii tm i unitiii inspection overhauling of hpt ipt control valves cam shaft assemblies and turbine bearings during the forthcoming annual overhaul
Read moreMtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Mtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv
Read moreMtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Read moreMtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Read moreMtps i tm unit ii overhauling of olctc system pump lhs and rhs inspection and cleaning of condenser cw box steam side hot well and olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve
Mtps i tm unit ii overhauling of olctc system pump lhs and rhs inspection and cleaning of condenser cw box steam side hot well and olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve etc
Read moreMtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re insulation to pipe lines and valves hp heaters gland steam cooler etc
Mtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re insulation to pipe lines and valves hp heaters gland steam cooler etc
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreMtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re insulation to pipe lines and valves hp heaters gland steam cooler lp heater and transportation of required material and disposal of scraps
Mtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re insulation to pipe lines and valves hp heaters gland steam cooler lp heater and transportation of required material and disposal of scraps
Read moreMtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re-insulation to pipe lines and valves hp heaters gland steam cooler lp heater and transportation of required material and disposal of scraps inturbine
Mtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re-insulation to pipe lines and valves hp heaters gland steam cooler lp heater and transportation of required material and disposal of scraps inturbine
Read moreof your Industry type