Tender Details
Particulars | Details |
---|---|
Title |
Mtps Tm Unit Iv Removal Of Insulation And Providing Re Insulation To Pipe Lines Valves Deaerator Main Flange Gland Steam Cooler Low Pressure Heater Flash Tanks And Its Accessories And Disposal Of Waste Insulation Materials For Unit Iv
|
Description |
Mtps Tm Unit Iv Removal Of Insulation And Providing Re Insulation To Pipe Lines Valves Deaerator Main Flange Gland Steam Cooler Low Pressure Heater Flash Tanks And Its Accessories And Disposal Of Waste Insulation Materials For Unit Iv
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_463942_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 113 / 2024-25 |
Tender Fee | 0 |
EMD | 3100 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=551376 |
Start Date | July 18, 2024 22:30 |
End Date |
24/07/2024 ( Expired 271 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreTtps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Read moreTtps mech ii tm ii removal and refixing of insulation in turbine casing valves and allied pipe lines in unit iv v for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm ii removal and refixing of insulation in turbine casing valves and allied pipe lines in unit iv v for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii tm ii kwu turbine unit iv v breakdown maintenance works in condenser hpbp valve lpt diaphragm and attending high pressure steam pipe lines punctures for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm ii kwu turbine unit iv v breakdown maintenance works in condenser hpbp valve lpt diaphragm and attending high pressure steam pipe lines punctures for the period from 01 04 2025 to 31 03 2026
Read moreMtps i civil circle up keeping of drains by removal of ash deposits, silt and other waste materials from the drain adjacent to the power house building on the southern side and along the 58s road leading from unit iv to canteen and from inside
Mtps i civil circle up keeping of drains by removal of ash deposits, silt and other waste materials from the drain adjacent to the power house building on the southern side and along the 58s road leading from unit iv to canteen and from inside
Read moreMtps i civil circle - cleaning removal collecting loading, transporting and disposal of debris / slush / silt and waste materials etc., in all around cooling tower unit i to iv area, cwph, chlorination building, lime softner house and central store
Mtps i civil circle - cleaning removal collecting loading, transporting and disposal of debris / slush / silt and waste materials etc., in all around cooling tower unit i to iv area, cwph, chlorination building, lime softner house and central store
Read moreMtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials
Read moreMtps i tm unit ii capital overhauling and gasket renewing of valves in feed water main condensate and extraction steam lines during capital overhauling 2024 25
Mtps i tm unit ii capital overhauling and gasket renewing of valves in feed water main condensate and extraction steam lines during capital overhauling 2024 25
Read moreMtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during coh 2024 25
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during coh 2024 25
Read moreMtps i bm unit ii boiler pressure parts coh 2024 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Mtps i bm unit ii boiler pressure parts coh 2024 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Read moreof your Industry type