Tender Details
About Tender
🏭 Mtps Tm Unit Iii Insulation Replacement Project 🛠️ Tneb Limited, A State Government Undertaking, Is Initiating A Tender For The Removal Of Existing Insulation And The Provision Of Re Insulation Services For Various Components Of Unit Iii At The Aoh (Automatic Oil Handling) Of Mettur Thermal Power Station I/Mettur Dam. 📅 Bid Submission Deadline: April 19, 2024, 2:00 Pm The Scope Of Work Includes The Removal Of Insulation From Pipe Lines, Valves, The Deaerator Main Flange, Gland Steam Cooler, Low Pressure Heater, Flash Tanks, And Associated Accessories, Along With The Disposal Of Waste Insulation Materials. Interested Bidders Are Required To Submit An Earnest Money Deposit (Emd) Of Inr 3000. Tender Documents Are Available Without Any Fee. Keywords: Mtps Tm Unit Iii, Insulation, Re Insulation, Tneb Limited, Power Station, State Government Undertaking, Tender, Bid Submission, Emd, Waste DisposalParticulars | Details |
---|---|
Title |
Mtps Tm Unit Iii Removal Of Insulation And Providing Re Insulation To Pipe Lines Valves Deaerator Main Flange Gland Steam Cooler Low Pressure Heater Flash Tanks And Its Accessories And Disposal Of Waste Insulation Materials For Unit Iii Aoh
|
Description |
Mtps Tm Unit Iii Removal Of Insulation And Providing Re Insulation To Pipe Lines Valves Deaerator Main Flange Gland Steam Cooler Low Pressure Heater Flash Tanks And Its Accessories And Disposal Of Waste Insulation Materials For Unit Iii Aoh
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_428369_1 |
Reference Number |
CE/MTPS-I/SE/M-I /TM/OT. 401 /2023-24 |
Tender Fee | 0 |
EMD | 3000 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=509368 |
Start Date | February 21, 2024 17:30 |
End Date |
19/04/2024 ( Expired 390 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Carrying out annual overhauling of heat recovery steam generator hp, ip and lp water/steam system valves of various sizes, safety valves, stg and hrsg flash tank, ibd and cbd tanks, gland steam condenser, deaerator and feed water storage tank overhau
Carrying out annual overhauling of heat recovery steam generator hp, ip and lp water/steam system valves of various sizes, safety valves, stg and hrsg flash tank, ibd and cbd tanks, gland steam condenser, deaerator and feed water storage tank overhau
Read moreBiennial work contract online sealing of different size high pressure water and steam lines valves at ph-iii 1x210mw unit at atps, mppgcl, chachai.
Biennial work contract online sealing of different size high pressure water and steam lines valves at ph-iii 1x210mw unit at atps, mppgcl, chachai.
Read moreMtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Read moreMtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Read moreMtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Mtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreTtps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Read moreTtps mech ii tm ii removal and refixing of insulation in turbine casing valves and allied pipe lines in unit iv v for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm ii removal and refixing of insulation in turbine casing valves and allied pipe lines in unit iv v for the period from 01 04 2025 to 31 03 2026
Read moreMtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials
Read moreMtps i tm unit ii capital overhauling and gasket renewing of valves in feed water main condensate and extraction steam lines during capital overhauling 2024 25
Mtps i tm unit ii capital overhauling and gasket renewing of valves in feed water main condensate and extraction steam lines during capital overhauling 2024 25
Read moreof your Industry type