Mtps Tm Unit Iv Removal Of Insulation And Providing Re Insulation To Pipe Lines Valves Deaerator Main Flange Gland Steam Cooler Low Pressure Heater Flash Tanks And Its Accessories And Disposal Of Waste Insulation Materials For Unit Iv
Description
Mtps Tm Unit Iv Removal Of Insulation And Providing Re Insulation To Pipe Lines Valves Deaerator Main Flange Gland Steam Cooler Low Pressure Heater Flash Tanks And Its Accessories And Disposal Of Waste Insulation Materials For Unit Iv
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_588831_1
Reference
Number
CE / MTPS-I / SE / M-I / TM /OT.224 / 2025-26
Tender Fee 0
EMD 3900
Tender Value -
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=703437

Start Date August 04, 2025 22:30
End Date
Expired 18/08/2025

Expired 425 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii

Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii

Read more
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27

Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27

Read more
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Read more
Ttps mechii tm ii unit iv overhauling of boiler feed pumps and deaerator system during annual overhaul 2026 27

Ttps mechii tm ii unit iv overhauling of boiler feed pumps and deaerator system during annual overhaul 2026 27

Read more
Ttps mechii tm i unitiii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during the forthcoming annual overhaul

Ttps mechii tm i unitiii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during the forthcoming annual overhaul

Read more
Mtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 2 3 4 gc 1 ejector 2a vent condenser and renewal of gasket at deaerator main

Mtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 2 3 4 gc 1 ejector 2a vent condenser and renewal of gasket at deaerator main

Read more
Mtps i tm unit ii cleaning and painting of inner and outer portion of receiver tanks of 1 and 2 for instrument air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type etc

Mtps i tm unit ii cleaning and painting of inner and outer portion of receiver tanks of 1 and 2 for instrument air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type etc

Read more
Mtps i tm unit ii overhauling of olctc system pump lhs and rhs inspection and cleaning of condenser cw box steam side hot well and olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve

Mtps i tm unit ii overhauling of olctc system pump lhs and rhs inspection and cleaning of condenser cw box steam side hot well and olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve etc

Read more
Mtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical

Mtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical

Read more
Mtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv

Mtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise