Tender Details
About Tender
🏭 Mtps Tm Unit I Insulation Services Bid 🛠️ Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Removal And Re Insulation Of Pipe Lines, Valves, And Associated Equipment At Mtps Tm Unit I, Including The Deaerator Main Flange, Vent Condenser, Gland Steam Cooler, Low Pressure Heater, Flash Tanks, And Their Accessories. Additionally, The Successful Bidder Will Be Responsible For The Disposal Of Waste Insulation Materials. 📅 Bid Submission Deadline: April 23, 2024, 2:00 Pm Bidders Must Submit A Security Deposit Of Inr 2700 With Their Bids. No Tender Fee Is Payable. Interested Contractors Should Provide Detailed Proposals, Including Methodology, Timelines, And Cost Estimates, Adhering To The Project's Environmental And Safety Standards. Keywords: Mtps Tm Unit I, Insulation Services, Tneb Limited, State Govt. And Ut, Power Station, Insulation Removal, Re Insulation, Waste Disposal, Tender, BidParticulars | Details |
---|---|
Title |
Mtps Tm Unit I Removal Of Insulation And Providing Re Insulation To Pipe Lines Valves Deaerator Main Flange Vent Condenser Gland Steam Cooler Low Pressure Heater Flash Tanks And Its Accessories And Disposal Of Waste Insulation Materials
|
Description |
Mtps Tm Unit I Removal Of Insulation And Providing Re Insulation To Pipe Lines Valves Deaerator Main Flange Vent Condenser Gland Steam Cooler Low Pressure Heater Flash Tanks And Its Accessories And Disposal Of Waste Insulation Materials
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_428594_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM / OT. 468 / 2023-24 |
Tender Fee | 0 |
EMD | 2700 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=509613 |
Start Date | February 21, 2024 22:30 |
End Date |
23/04/2024 ( Expired 386 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Carrying out annual overhauling of heat recovery steam generator hp, ip and lp water/steam system valves of various sizes, safety valves, stg and hrsg flash tank, ibd and cbd tanks, gland steam condenser, deaerator and feed water storage tank overhau
Carrying out annual overhauling of heat recovery steam generator hp, ip and lp water/steam system valves of various sizes, safety valves, stg and hrsg flash tank, ibd and cbd tanks, gland steam condenser, deaerator and feed water storage tank overhau
Read moreMtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Read moreMtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau
Read moreMtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Mtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreTtps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Read moreMtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 1 2 3 4 gc i ii vent condenser renewal of gasket at deaerator main flange
Mtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 1 2 3 4 gc i ii vent condenser renewal of gasket at deaerator main flange
Read moreMtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials
Read moreMtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during coh 2024 25
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during coh 2024 25
Read moreMtps i tm unit iv overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit iv during aoh 2024 25
Mtps i tm unit iv overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit iv during aoh 2024 25
Read moreof your Industry type