Tender Details
Particulars | Details |
---|---|
Title |
Mtps Tm Unit Ii Removal Of Insulation And Providing Re Insulation To Pipe Lines Valves Deaerator Main Flange Vent Condenser Gland Steam Cooler Low Pressure Heater Flash Tanks And Its Accessories And Disposal Of Waste Insulation Materials
|
Description |
Mtps Tm Unit Ii Removal Of Insulation And Providing Re Insulation To Pipe Lines Valves Deaerator Main Flange Vent Condenser Gland Steam Cooler Low Pressure Heater Flash Tanks And Its Accessories And Disposal Of Waste Insulation Materials
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_489911_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 191/ 2024-25 |
Tender Fee | 0 |
EMD | 5700 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=582090 |
Start Date | September 30, 2024 23:30 |
End Date |
14/10/2024 ( Expired 189 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreTtps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Read moreMtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 1 2 3 4 gc i ii vent condenser renewal of gasket at deaerator main flange
Mtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 1 2 3 4 gc i ii vent condenser renewal of gasket at deaerator main flange
Read moreMtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials
Read moreMtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during coh 2024 25
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during coh 2024 25
Read moreMtps i tm unit iv overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit iv during aoh 2024 25
Mtps i tm unit iv overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit iv during aoh 2024 25
Read moreMtps tm unit iv removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit iv
Mtps tm unit iv removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit iv
Read moreMtps i tm unit iv removal and re insulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2024 25
Mtps i tm unit iv removal and re insulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2024 25
Read moreTtps mech ii tm i unit iii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during annual overhaul 2024 2025
Ttps mech ii tm i unit iii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during annual overhaul 2024 2025
Read moreTtps mech ii tm i unit iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves during annual overhaul 2024 2025
Ttps mech ii tm i unit iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves during annual overhaul 2024 2025
Read moreof your Industry type