Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Tm Unit I To Iv Attending Breakdown Maintenance Work Of Removal Of Insulation And Providing Re Insulation To Pipe Lines And Valves Hp Heaters Gland Steam Cooler Lp Heater And Transportation Of Required Material And Disposal Of Scraps In Turbine
|
| Description |
Mtps I Tm Unit I To Iv Attending Breakdown Maintenance Work Of Removal Of Insulation And Providing Re Insulation To Pipe Lines And Valves Hp Heaters Gland Steam Cooler Lp Heater And Transportation Of Required Material And Disposal Of Scraps In Turbine
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_624044_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 398 / 2025-26 |
| Tender Fee | 0 |
| EMD | 9500 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=746195 |
| Start Date | November 17, 2025 18:30 |
| End Date |
Expired
01/12/2025
Expired 317 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreMtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027
Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027
Read moreTtps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Ttps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul
Read moreMtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27
Mtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27
Read moreMtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Mtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
Read moreMtps i tm unit ii overhauling of olctc system pump lhs and rhs inspection and cleaning of condenser cw box steam side hot well and olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve
Mtps i tm unit ii overhauling of olctc system pump lhs and rhs inspection and cleaning of condenser cw box steam side hot well and olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve etc
Read moreMtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re insulation to pipe lines and valves hp heaters gland steam cooler lp heater and transportation of required material and disposal of scraps
Mtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re insulation to pipe lines and valves hp heaters gland steam cooler lp heater and transportation of required material and disposal of scraps
Read moreMtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re insulation to pipe lines and valves hp heaters gland steam cooler etc
Mtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re insulation to pipe lines and valves hp heaters gland steam cooler etc
Read moreof your Industry type