Tender Details

Particulars Details
Title
Mtps I Tm Unit I To Iv Attending Breakdown Maintenance Work Of Removal Of Insulation And Providing Re Insulation To Pipe Lines And Valves Hp Heaters Gland Steam Cooler Lp Heater And Transportation Of Required Material And Disposal Of Scraps In Turbine
Description
Mtps I Tm Unit I To Iv Attending Breakdown Maintenance Work Of Removal Of Insulation And Providing Re Insulation To Pipe Lines And Valves Hp Heaters Gland Steam Cooler Lp Heater And Transportation Of Required Material And Disposal Of Scraps In Turbine
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_624044_1
Reference
Number
CE / MTPS-I / SE / M-I / TM /OT. 398 / 2025-26
Tender Fee 0
EMD 9500
Tender Value -
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=746195

Start Date November 17, 2025 18:30
End Date
Expired 01/12/2025

Expired 317 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii

Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii

Read more
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Read more
Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027

Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027

Read more
Ttps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul

Ttps mech ii tm i unit iii inspection overhauling rectification of condenser steam side longitudinal bellows hp lp bypass valves and oil system steam and condensate valves for main turbine system during the forthcoming annual overhaul

Read more
Mtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27

Mtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27

Read more
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27

Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27

Read more
Mtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc

Mtps i bm unit ii boiler pressure parts aoh 2026 removal and refixing of skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc

Read more
Mtps i tm unit ii overhauling of olctc system pump lhs and rhs inspection and cleaning of condenser cw box steam side hot well and olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve

Mtps i tm unit ii overhauling of olctc system pump lhs and rhs inspection and cleaning of condenser cw box steam side hot well and olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve etc

Read more
Mtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re insulation to pipe lines and valves hp heaters gland steam cooler lp heater and transportation of required material and disposal of scraps

Mtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re insulation to pipe lines and valves hp heaters gland steam cooler lp heater and transportation of required material and disposal of scraps

Read more
Mtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re insulation to pipe lines and valves hp heaters gland steam cooler etc

Mtps i tm unit i to iv attending breakdown maintenance work of removal of insulation and providing re insulation to pipe lines and valves hp heaters gland steam cooler etc

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise