Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm Unit Ii Changing The Eroded Drip Line Reducers Expanders Bends Defective Eroded Plug Broken 1 2 Drain Line Vent Line Valves Pipes Bends And Replacing The Defective Vdas 122 Valve By Ibr Non Ibr Welding In Unit Ii During Capital Overha
|
Description |
Mtps I Tm Unit Ii Changing The Eroded Drip Line Reducers Expanders Bends Defective Eroded Plug Broken 1 2 Drain Line Vent Line Valves Pipes Bends And Replacing The Defective Vdas 122 Valve By Ibr Non Ibr Welding In Unit Ii During Capital Overha
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_489107_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 186 / 2024-25 |
Tender Fee | 0 |
EMD | 9900 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=581186 |
Start Date | September 27, 2024 22:30 |
End Date |
11/10/2024 ( Expired 226 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Read moreMtps i tm unit ii replacing the existing defective vent condenser tube nest by a retubed spare tube nest in unit ii during unit shutdown period
Mtps i tm unit ii replacing the existing defective vent condenser tube nest by a retubed spare tube nest in unit ii during unit shutdown period
Read moreMtps i tm unit ii changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective vdas 122 valve by ibr non ibr welding in unit ii during capital overha
Mtps i tm unit ii changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective vdas 122 valve by ibr non ibr welding in unit ii during capital overha
Read moreMtps i tm unit iv replacing the defective valves vdas 122 dw 14 modification of hpt ipt existing 1 casing drain line valves into 2 valves changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line
Mtps i tm unit iv replacing the defective valves vdas 122 dw 14 modification of hpt ipt existing 1 casing drain line valves into 2 valves changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line
Read moreMtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Mtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Read moreMtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment
Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment
Read moreMtps i tm i unit i cleaning inspection of jack oil line pipes from bearing pedestals to jack oil pump renewal of packing and clamps and renewal of defective jop pipe line and painting in unit i during aoh
Mtps i tm i unit i cleaning inspection of jack oil line pipes from bearing pedestals to jack oil pump renewal of packing and clamps and renewal of defective jop pipe line and painting in unit i during aoh
Read moreMtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves
Mtps i tm unit i replacing the defective main steam stop valves left and right at turbine end as per ibr specification including drawl of reconditioned valves from stores leading lifting erection alignment ibr welding stress relieving of valves
Read moreMtps i tm unit i replacing of the defective valve vdas 122 modification of hpt ipt existing 1inch casing drain line valves into 2inch valves and changing the eroded drip line reducers expanders etc
Mtps i tm unit i replacing of the defective valve vdas 122 modification of hpt ipt existing 1inch casing drain line valves into 2inch valves and changing the eroded drip line reducers expanders etc
Read moreMtps i tm unit iii replacing of the defective dw 73 74 vdas122 mc50 valves by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 inch and 2 inch drain line
Mtps i tm unit iii replacing of the defective dw 73 74 vdas122 mc50 valves by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 inch and 2 inch drain line