Tender Details

Particulars Details
Title
Mtps I Tm Unit I Replacing Of The Defective Hrh Stub Valve Vdas 122 Eroded Hrh Crh Hp Lp Bypass Drain Line To Flash Tank Ii Connected Headers And Changing The Eroded Drip Line Reducers Expanders Bends Of Hd 1 2 14 15
Description
Mtps I Tm Unit I Replacing Of The Defective Hrh Stub Valve Vdas 122 Eroded Hrh Crh Hp Lp Bypass Drain Line To Flash Tank Ii Connected Headers And Changing The Eroded Drip Line Reducers Expanders Bends Of Hd 1 2 14 15
Organisation TNEB Limited | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 10600
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link

AAAAAAAAAA

Login to view
Start Date June 03, 2025 21:30
End Date

17/06/2025 ( 12 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Mtps i tm unit i replacing of the defective hrh stub valve vdas 122 eroded hrh crh hp lp bypass drain line to flash tank ii connected headers and changing the eroded drip line reducers expanders bends of hd 1 2 14 15

Mtps i tm unit i replacing of the defective hrh stub valve vdas 122 eroded hrh crh hp lp bypass drain line to flash tank ii connected headers and changing the eroded drip line reducers expanders bends of hd 1 2 14 15

Read more
Mtps i tm unit ii changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective vdas 122 valve by ibr non ibr welding in unit ii during capital overha

Mtps i tm unit ii changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective vdas 122 valve by ibr non ibr welding in unit ii during capital overha

Read more
Mtps i tm unit iv replacing the defective valves vdas 122 dw 14 modification of hpt ipt existing 1 casing drain line valves into 2 valves changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line

Mtps i tm unit iv replacing the defective valves vdas 122 dw 14 modification of hpt ipt existing 1 casing drain line valves into 2 valves changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line

Read more
Residual life assessment (rla) study of critical piping (i.e. ms, crh, hrh, hp and lp bypass line, feed water station, crh to deaerator and hp heater etc) related to turbine side of unit no. 1,2 and 3 (210mw), mtps, dvc, bankura

Residual life assessment (rla) study of critical piping (i.e. ms,&#x0d crh, hrh, hp and lp bypass line, feed water station, crh to deaerator and hp heater etc)&#x0d related to turbine side of unit no. 1,2 and 3 (210mw), mtps, dvc, bankura

Read more
Mtps i tm unit i replacing of the defective valve vdas 122 modification of hpt ipt existing 1inch casing drain line valves into 2inch valves and changing the eroded drip line reducers expanders etc

Mtps i tm unit i replacing of the defective valve vdas 122 modification of hpt ipt existing 1inch casing drain line valves into 2inch valves and changing the eroded drip line reducers expanders etc

Read more
Mtps i tm unit i complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2024 2025

Mtps i tm unit i complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2024 2025

Read more
Mtps i tm unit iii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2024 2025

Mtps i tm unit iii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2024 2025

Read more
Mtps i tm unit iii replacing of the defective dw 73 74 vdas122 mc50 valves by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 inch and 2 inch drain line

Mtps i tm unit iii replacing of the defective dw 73 74 vdas122 mc50 valves by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 inch and 2 inch drain line

Read more
Mtps i tm unit ii changing the defective valves of ipt flange and stud heating line as 8 bfp rc 2a by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 and 2 drain line

Mtps i tm unit ii changing the defective valves of ipt flange and stud heating line as 8 bfp rc 2a by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 and 2 drain line

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise