| Particulars | Details |
|---|---|
| Title |
Mtps I Bm Aoh 2026 Unit I Boiler Pressure Parts Replacing Overheated Hrh Stub Bends And Other Circuit Bends At Penthouse Area And Allied Works
|
| Description |
Mtps I Bm Aoh 2026 Unit I Boiler Pressure Parts Replacing Overheated Hrh Stub Bends And Other Circuit Bends At Penthouse Area And Allied Works
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2026_EB_672736_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / BM /OT. 551 /2025-26 |
| Tender Fee | 0 |
| EMD | 19200 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=808507 |
| Start Date | March 10, 2026 20:30 |
| End Date |
Expired
24/03/2026
Expired 206 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mech ii bm unit i replacement of boiler pressure parts tubes bends in screen tube and coutant bottom area in unit i boiler
Ttps mech ii bm unit i replacement of boiler pressure parts tubes bends in screen tube and coutant bottom area in unit i boiler
Read moreTtps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027
Read moreProcurement of economizer bends tube used at economizer modules repairing and unit-6 boiler overhauling under bm dept. stps,wbpdcl.
Procurement of economizer bends tube used at economizer modules repairing and unit-6 boiler overhauling under bm dept. stps,wbpdcl.
Read moreMtps i - civil circle - replacing the damaged acc sheets with new galvalume sheets (0.8 mm) for the roof top of boiler unit i at mtps i
Mtps i - civil circle - replacing the damaged acc sheets with new galvalume sheets (0.8 mm) for the roof top of boiler unit i at mtps i
Read moreMtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27
Mtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27
Read moreTtps mech ii bm unit iii replacement of boiler pressure parts tubes bends in ii pass of unit iii boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in ii pass of unit iii boiler during overhaul for the year 2026 2027
Read moreTtps mech ii bm unit iii replacement of boiler pressure parts tubes bends i pass ii pass in unit-iii boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends i pass ii pass in unit-iii boiler during overhaul for the year 2026 2027
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreMtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Read moreof your Industry type