Tender Details

Particulars Details
Title
Mtps I Bm Aoh 2026 Unit I Boiler Pressure Parts Replacing Overheated Hrh Stub Bends And Other Circuit Bends At Penthouse Area And Allied Works
Description
Mtps I Bm Aoh 2026 Unit I Boiler Pressure Parts Replacing Overheated Hrh Stub Bends And Other Circuit Bends At Penthouse Area And Allied Works
Organisation TNEB Limited | State Govt. and UT
Tender Id 2026_EB_672736_1
Reference
Number
CE / MTPS-I / SE / M-I / BM /OT. 551 /2025-26
Tender Fee 0
EMD 19200
Tender Value -
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=808507

Start Date March 10, 2026 20:30
End Date
Expired 24/03/2026

Expired 206 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Ttps mech ii bm unit i replacement of boiler pressure parts tubes bends in screen tube and coutant bottom area in unit i boiler

Ttps mech ii bm unit i replacement of boiler pressure parts tubes bends in screen tube and coutant bottom area in unit i boiler

Read more
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027

Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027

Read more
Procurement of economizer bends tube used at economizer modules repairing and unit-6 boiler overhauling under bm dept. stps,wbpdcl.

Procurement of economizer bends tube used at economizer modules repairing and unit-6 boiler overhauling under bm dept. stps,wbpdcl.

Read more
Mtps i - civil circle - replacing the damaged acc sheets with new galvalume sheets (0.8 mm) for the roof top of boiler unit i at mtps i

Mtps i - civil circle - replacing the damaged acc sheets with new galvalume sheets (0.8 mm) for the roof top of boiler unit i at mtps i

Read more
Mtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27

Mtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27

Read more
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in ii pass of unit iii boiler during overhaul for the year 2026 2027

Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in ii pass of unit iii boiler during overhaul for the year 2026 2027

Read more
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends i pass ii pass in unit-iii boiler during overhaul for the year 2026 2027

Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends i pass ii pass in unit-iii boiler during overhaul for the year 2026 2027

Read more
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27

Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27

Read more
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27

Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27

Read more
Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc

Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise