Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Tm Unit Iv Replacing The Defective Valves Vdas 122 Dw 14 Modification Of Hpt Ipt Existing 1 Casing Drain Line Valves Into 2 Valves Changing The Eroded Drip Line Reducers Expanders And Changing The Defective Eroded Plug Broken 1 2 Drain Line
|
| Description |
Mtps I Tm Unit Iv Replacing The Defective Valves Vdas 122 Dw 14 Modification Of Hpt Ipt Existing 1 Casing Drain Line Valves Into 2 Valves Changing The Eroded Drip Line Reducers Expanders And Changing The Defective Eroded Plug Broken 1 2 Drain Line
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_463923_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT.112 / 2024-25 |
| Tender Fee | 0 |
| EMD | 5300 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=551354 |
| Start Date | July 18, 2024 22:30 |
| End Date |
Expired
24/07/2024
Expired 771 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing services of experts along with testing equipment for on-line safety valves pressure setting in boilers of rtps units-1 to 8 for the year 2026-27
Providing services of experts along with testing equipment for on-line safety valves pressure setting in boilers of rtps units-1 to 8 for the year 2026-27
Read moreMtps i tm unit i replacing of the defective valve vdas 122 modification of hpt ipt existing 1inch casing drain line valves into 2inch valves and changing the eroded drip line reducers expanders etc
Mtps i tm unit i replacing of the defective valve vdas 122 modification of hpt ipt existing 1inch casing drain line valves into 2inch valves and changing the eroded drip line reducers expanders etc
Read moreMtps i tm unit iv replacing the defective valve vdas 122 eroded flash tank-i changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line vent line valves pipes bends by ibr non ibr
Mtps i tm unit iv replacing the defective valve vdas 122 eroded flash tank-i changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 2 drain line vent line valves pipes bends by ibr non ibr
Read moreMtps i tm unit ii changing the defective valves of ipt flange and stud heating line as 8 bfp rc 2a by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 and 2 drain line
Mtps i tm unit ii changing the defective valves of ipt flange and stud heating line as 8 bfp rc 2a by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 and 2 drain line
Read moreMtps i tm unit ii changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective vdas 122 valve by ibr non ibr welding in unit ii during capital overha
Mtps i tm unit ii changing the eroded drip line reducers expanders bends defective eroded plug broken 1 2 drain line vent line valves pipes bends and replacing the defective vdas 122 valve by ibr non ibr welding in unit ii during capital overha
Read moreMtps i tm unit iii replacing of the defective dw 73 74 vdas122 mc50 valves by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 inch and 2 inch drain line
Mtps i tm unit iii replacing of the defective dw 73 74 vdas122 mc50 valves by cutting and welding changing the eroded drip line reducers expanders and changing the defective eroded plug broken 1 inch and 2 inch drain line
Read moreMtps i tm unit i replacing of the defective hrh stub valve vdas 122 eroded hrh crh hp lp bypass drain line to flash tank ii connected headers and changing the eroded drip line reducers expanders bends of hd 1 2 14 15
Mtps i tm unit i replacing of the defective hrh stub valve vdas 122 eroded hrh crh hp lp bypass drain line to flash tank ii connected headers and changing the eroded drip line reducers expanders bends of hd 1 2 14 15
Read moreMtps i tm unit ii transporting the valves from central store replacing the defective extraction steam to hp heaters 5 6 isolation valves es 5 es 6 mc 29 mc nrv deaerator floor bfp suction valves 2c ca 24 eroded drip line reducers
Mtps i tm unit ii transporting the valves from central store replacing the defective extraction steam to hp heaters 5 6 isolation valves es 5 es 6 mc 29 mc nrv deaerator floor bfp suction valves 2c ca 24 eroded drip line reducers
Read moreMtps i tm units i to iv attending the preventive breakdown maintenance works of valves pipe lines reducers by cutting welding gasket renewing of valves flanges and overhauling of defective passing valves in units i to iv during 2023 24
Mtps i tm units i to iv attending the preventive breakdown maintenance works of valves pipe lines reducers by cutting welding gasket renewing of valves flanges and overhauling of defective passing valves in units i to iv during 2023 24
Read moreof your Industry type