Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Internal Inspection Of Failed Telk Make 20 Mva 132 Or 34 Point 5 K V Power
|
| Description |
|
| Organisation | Contracts and Materials | Ministry of Power |
| Tender Id | GEM/2025/B/6152310 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | April 26, 2025 21:08 |
| End Date |
Expired
06/05/2025
Expired 508 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreCustom bid for services - internal inspection of failed telk make 20 mva 132 or 33 kv power transfo
Read more
Custom bid for services - internal inspection of failed telk make 20 mva 132345 kv power transforme
Read more
S /e for augmentation of 220 kv substation ia hisar from 2x100 mva 220/132 kv plus 1x20/25 mva 132/33 kv plus 1x16/20 mva 132/11 kv transformers to 1x100 mva plus 1x160 mva 220/132 kv plus 1x40/50 mva 132/33 kv plus 1x16/20 mva 132/11 kv transformers
S /e for augmentation of 220 kv substation ia hisar from 2x100 mva 220/132 kv plus 1x20/25 mva 132/33 kv plus 1x16/20 mva 132/11 kv transformers to 1x100 mva plus 1x160 mva 220/132 kv plus 1x40/50 mva 132/33 kv plus 1x16/20 mva 132/11 kv transformers
Read moreAug. of 220 kv ia hisar from 2x100 mva, 220/132 kv plus 1x 20/25 mva, 132/33 kv plus 1 x 16/20 mva, 132/11 kv t/f to 1x100 mva, plus 1x 160 mva 220/132 kv plus 1x 40/50 mva, 132/33 kv plus 1 x 16/20 mva, 132/11 kv t/f fy 2022-23.(strengthening of t/f
Aug. of 220 kv ia hisar from 2x100 mva, 220/132 kv plus 1x 20/25 mva, 132/33 kv plus 1 x 16/20 mva, 132/11 kv t/f to 1x100 mva, plus 1x 160 mva 220/132 kv plus 1x 40/50 mva, 132/33 kv plus 1 x 16/20 mva, 132/11 kv t/f fy 2022-23.(strengthening of t/f
Read moreAugumentation of 132 kv substation dadri-1 from 1x16/20 mva 132/11 kv plus 1x20/25 mva, 132/33 kv plus 1x8/4/4 mva, 132/33/3.3 kv t/fs to 1x16/20 mva, 132/11 kv plus 2x20/25 mva, 132/33 kv t/fs in fy 2022-23.
Augumentation of 132 kv substation dadri-1 from 1x16/20 mva 132/11 kv plus 1x20/25 mva, 132/33 kv plus 1x8/4/4 mva, 132/33/3.3 kv t/fs to 1x16/20 mva, 132/11 kv plus 2x20/25 mva, 132/33 kv t/fs in fy 2022-23.
Read moreAugmentation of 132 kv substation jhojhu kalan from 1x20/25 mva, 132/33 kv plus (1x16/20 plus 1x10/16) mva, 132/11 kv t/fs to 2x20/25 mva, 132/33 kv plus (1x16/20 plus 1x10/16) mva, 132/11 kv t/fs.
Augmentation of 132 kv substation jhojhu kalan from 1x20/25 mva, 132/33 kv plus (1x16/20 plus 1x10/16) mva, 132/11 kv t/fs to 2x20/25 mva, 132/33 kv plus (1x16/20 plus 1x10/16) mva, 132/11 kv t/fs.
Read moreAugmentation of 132 kv substation jhojhu kalan from 1x20/25 mva, 132/33 kv plus (1x16/20 plus 1x10/16) mva, 132/11 kv t/fs to 2x20/25 mva, 132/33 kv plus (1x16/20 plus 1x10/16) mva, 132/11 kv t/fs.
Augmentation of 132 kv substation jhojhu kalan from 1x20/25 mva, 132/33 kv plus (1x16/20 plus 1x10/16) mva, 132/11 kv t/fs to 2x20/25 mva, 132/33 kv plus (1x16/20 plus 1x10/16) mva, 132/11 kv t/fs.
Read moreErection of replacement against failed 132/33 kv 40 mva bhel make transformer by new 50 mva 132/33 kv transformer at 220 kv s/s ratlam.
Erection of replacement against failed 132/33 kv 40 mva bhel make transformer by new 50 mva 132/33 kv transformer at 220 kv s/s ratlam.
Read moreof your Industry type