Construction Of 40 M Ground Based Tower Including Rcc Foundation, Erection Of Tower With Available Tower Material And Construction Of Rcc Bed For Dg At Mahindra Hills 2nd Site, Secunderabad
Description
Construction Of 40 M Ground Based Tower Including Rcc Foundation, Erection Of Tower With Available Tower Material And Construction Of Rcc Bed For Dg At Mahindra Hills 2nd Site, Secunderabad
Organisation Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings
Tender Id 2024_BSNL_199937_1
Reference
Number
NIT No. 26/CECTSCZ/HYD/2024-25
Tender Fee 590
EMD 30900
Tender Value -
Place Mahindra Hills, Secunderabad
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=218861

Start Date July 01, 2024 22:15
End Date
Expired 09/07/2024

Expired 827 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Construction of 40 m ground based tower including rcc foundation, erection of tower with available tower material and construction of rcc bed for dg at mahindra hills 2nd site, secunderabad-recall

Construction of 40 m ground based tower including rcc foundation, erection of tower with available tower material and construction of rcc bed for dg at mahindra hills 2nd site, secunderabad-recall

Read more
Construction of 40 m ground based tower with rcc foundation including erection of tower, erection of bts shelter with available tower/bts materials at bsnl stores including transportation of the material to site and providing bts bed at new collect

Construction of 40 m ground based tower with rcc foundation including erection of tower, erection of bts shelter with available tower/bts materials at bsnl stores including transportation of the material to site and providing bts bed at new collect

Read more
Construction of 40 m ground based tower including rcc foundation, erection of tower with available tower material, erection of bts shelter including foundation and barbed wire fencing with rcc posts etc at nagaram nbsnl_hd5597, vikarabad

Construction of 40 m ground based tower including rcc foundation, erection of tower with available tower material, erection of bts shelter including foundation and barbed wire fencing with rcc posts etc at nagaram nbsnl_hd5597, vikarabad

Read more
Construction of 40m ground based tower (narrow based light weight tower) using available tower material at bsnl store including rcc foundation at munipally (srit _ ankapur_ nz2133),nzb-ba

Construction of 40m ground based tower (narrow based light weight tower) using available tower material at bsnl store including rcc foundation at munipally (srit _ ankapur_ nz2133),nzb-ba

Read more
Construction of 40mtr ground based communication tower including foundation, erection of tower, earthing, rcc platforms for dg and bts at manjeshwar north

Construction of 40mtr ground based communication tower including foundation, erection of tower, earthing, rcc platforms for dg and bts at manjeshwar north (rp id-0874), kasaragod

Read more
Providing foundation bed for 40.00 meters height bsnl narrow base tower

Providing foundation bed for 40.00 meters height bsnl narrow base tower at oc premises for establishing communication in sathupalli, kothagudem area, khammam district, telangana state.(invited under earmarked work - sccl registered contractors belongs to sc community only are eligible to participate)

Read more