Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 40 M Ground Based Tower Including Rcc Foundation, Erection Of Tower With Available Tower Material And Construction Of Rcc Bed For Dg At Mahindra Hills 2nd Site, Secunderabad
|
| Description |
Construction Of 40 M Ground Based Tower Including Rcc Foundation, Erection Of Tower With Available Tower Material And Construction Of Rcc Bed For Dg At Mahindra Hills 2nd Site, Secunderabad
|
| Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
| Tender Id | 2024_BSNL_199937_1 |
|
Reference Number |
NIT No. 26/CECTSCZ/HYD/2024-25 |
| Tender Fee | 590 |
| EMD | 30900 |
| Tender Value | - |
| Place | Mahindra Hills, Secunderabad |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=218861 |
| Start Date | July 01, 2024 22:15 |
| End Date |
Expired
09/07/2024
Expired 827 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreConstruction of 40 m ground based tower including rcc foundation, erection of tower with available tower material and construction of rcc bed for dg at mahindra hills 2nd site, secunderabad-recall
Construction of 40 m ground based tower including rcc foundation, erection of tower with available tower material and construction of rcc bed for dg at mahindra hills 2nd site, secunderabad-recall
Read moreConstruction of 40 m ground based tower with rcc foundation including erection of tower, erection of bts shelter with available tower/bts materials at bsnl stores including transportation of the material to site and providing bts bed at new collect
Construction of 40 m ground based tower with rcc foundation including erection of tower, erection of bts shelter with available tower/bts materials at bsnl stores including transportation of the material to site and providing bts bed at new collect
Read moreConstruction of 40 m ground based tower including rcc foundation, erection of tower with available tower material, erection of bts shelter including foundation and barbed wire fencing with rcc posts etc at nagaram nbsnl_hd5597, vikarabad
Construction of 40 m ground based tower including rcc foundation, erection of tower with available tower material, erection of bts shelter including foundation and barbed wire fencing with rcc posts etc at nagaram nbsnl_hd5597, vikarabad
Read moreConstruction of 40m ground based tower (narrow based light weight tower) using available tower material at bsnl store including rcc foundation at munipally (srit _ ankapur_ nz2133),nzb-ba
Construction of 40m ground based tower (narrow based light weight tower) using available tower material at bsnl store including rcc foundation at munipally (srit _ ankapur_ nz2133),nzb-ba
Read moreConstruction of 40mtr ground based communication tower including foundation, erection of tower, earthing, rcc platforms for dg and bts at manjeshwar north
Construction of 40mtr ground based communication tower including foundation, erection of tower, earthing, rcc platforms for dg and bts at manjeshwar north (rp id-0874), kasaragod
Read moreProviding foundation bed for 40.00 meters height bsnl narrow base tower
Providing foundation bed for 40.00 meters height bsnl narrow base tower at oc premises for establishing communication in sathupalli, kothagudem area, khammam district, telangana state.(invited under earmarked work - sccl registered contractors belongs to sc community only are eligible to participate)
Read moreof your Industry type