Construction Of 40m Ground Based Tower (Narrow Based Light Weight Tower) Using Available Tower Material At Bsnl Store Including Rcc Foundation At Munipally (Srit Ankapur Nz2133),Nzb Ba
|
| Description |
Construction Of 40m Ground Based Tower (Narrow Based Light Weight Tower) Using Available Tower Material At Bsnl Store Including Rcc Foundation At Munipally (Srit Ankapur Nz2133),Nzb Ba
|
| Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
| Tender Id | 2026_BSNL_275178_1 |
|
Reference Number |
NIT No. 03/NIT/CECTSCZ/HYD/2026 |
| Tender Fee | 590 |
| EMD | 26200 |
| Tender Value | - |
| Place | Munipally, Nizamabad |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=321402 |
| Start Date | April 18, 2026 22:50 |
| End Date |
Expired
27/04/2026
Expired 172 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of tower foundation bts platform erection of 40m tower nblw nbfl make at vaious locations aprox 16 nos for kumbh mela at nashik 2027 2nd call
Construction of tower foundation bts platform erection of 40m tower nblw nbfl make at vaious locations aprox 16 nos for kumbh mela at nashik 2027 2nd call
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreConstruction of 40m narrow based light weight ground based tower foundation, including dg and odbts plinths, at chintapalli, visakhapatnam district
Construction of 40m narrow based light weight ground based tower foundation, including dg and odbts plinths, at chintapalli, visakhapatnam district
Read moreProviding foundation bed for 40.00 meters height bsnl narrow base tower
Providing foundation bed for 40.00 meters height bsnl narrow base tower at oc premises for establishing communication in sathupalli, kothagudem area, khammam district, telangana state.(invited under earmarked work - sccl registered contractors belongs to sc community only are eligible to participate)
Read moreConstruction of 40m narrow based light weight ground based tower foundation, including dg and odbts plinths, erection of tower in staff quarters compound at dandubazar, visakhapatnam
Construction of 40m narrow based light weight ground based tower foundation, including dg and odbts plinths, erection of tower in staff quarters compound at dandubazar, visakhapatnam
Read moreConstruction of 40m high narrow base light weight ground based tower at te ismailabad district kurukshetra hr sh tower foundation erection of tower painting dismantling and disposal of existing damaged tower
Construction of 40m high narrow base light weight ground based tower at te ismailabad district kurukshetra hr sh tower foundation erection of tower painting dismantling and disposal of existing damaged tower
Read moreConstn of 40m gbt foundation and erection of tower with available materials at ecil hyderabad
Construction of 40 m ground based tower foundation and erection of tower, erection of shelter, dg bed at ecil, hyderabad 2nd call
Read moreProviding foundation and erection of 40m ground narrow based light weight tower including horizontal gantry and od bts/ea bed at at iiser,yerpedu in chittoor ba.
Providing foundation and erection of 40m ground narrow based light weight tower including horizontal gantry and od bts/ea bed at at iiser,yerpedu in chittoor ba.
Read moreRedeployment of 40m bsnl nblw tower infrastructure at kale
Redeployment of 40m bsnl nblw tower infrastructure including
 erection of tower cable runway and earthing at kale tal panhala
 kolhapur district