Tender Details

Particulars Details
Title
Construction Of 40 M Ground Based Tower Including Rcc Foundation, Erection Of Tower With Available Tower Material, Erection Of Bts Shelter Including Foundation And Barbed Wire Fencing With Rcc Posts Etc At Nagaram Nbsnl Hd5597, Vikarabad
Description
Construction Of 40 M Ground Based Tower Including Rcc Foundation, Erection Of Tower With Available Tower Material, Erection Of Bts Shelter Including Foundation And Barbed Wire Fencing With Rcc Posts Etc At Nagaram Nbsnl Hd5597, Vikarabad
Organisation Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings
Tender Id 2024_BSNL_218644_1
Reference
Number
NIT No. 80/NIT/CECTSCZ/HYD/2024-25
Tender Fee 590
EMD 33000
Tender Value -
Place Nagaram, Vikarabad
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=242640

Start Date December 10, 2024 00:05
End Date
Expired 17/12/2024

Expired 666 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of tower foundation bts platform erection of 40m tower nblw nbfl make at vaious locations aprox 16 nos for kumbh mela at nashik 2027 2nd call

Construction of tower foundation bts platform erection of 40m tower nblw nbfl make at vaious locations aprox 16 nos for kumbh mela at nashik 2027 2nd call

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Construction of 40 m ground based tower with rcc foundation including erection of tower, erection of bts shelter with available tower/bts materials at bsnl stores including transportation of the material to site and providing bts bed at new collect

Construction of 40 m ground based tower with rcc foundation including erection of tower, erection of bts shelter with available tower/bts materials at bsnl stores including transportation of the material to site and providing bts bed at new collect

Read more
Construction of 40mtr ground based communication tower including foundation, erection of tower, earthing, rcc platforms for dg and bts at manjeshwar north

Construction of 40mtr ground based communication tower including foundation, erection of tower, earthing, rcc platforms for dg and bts at manjeshwar north (rp id-0874), kasaragod

Read more
Erection of 40m (flood light type) narrow base tower including foundation, engine bed,earthing , gantry and erection of bts shelter at vadaseri, thanjavur ba.

Erection of 40m (flood light type) narrow base tower including foundation, engine bed,earthing , gantry and erection of bts shelter at vadaseri, thanjavur ba.

Read more
Construction of 2 nos tower foundation and bts foundation for 40 metre tower in phase ix.1 in sdca chamorshi under gadchiroli ssa sh c o 01 no. tower foundation bts foundation and tower erection at kalinagar under chamorshi sdca

Construction of 2 nos tower foundation and bts foundation for 40 metre tower in phase ix.1 in sdca chamorshi under gadchiroli ssa sh c o 01 no. tower foundation bts foundation and tower erection at kalinagar under chamorshi sdca&#x0d &#x0d

Read more
Construction of 40 m ground based tower including rcc foundation, erection of tower with available tower material and construction of rcc bed for dg at mahindra hills 2nd site, secunderabad

Construction of 40 m ground based tower including rcc foundation, erection of tower with available tower material and construction of rcc bed for dg at mahindra hills 2nd site, secunderabad

Read more
Construction of tower and bts foundation and re erection of 40m tower at jalalkheda tah narkhed distt nagpur

Construction of tower and bts foundation and re erection of 40m tower at jalalkheda tah narkhed distt nagpur

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise