Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 40 M Ground Based Tower With Rcc Foundation Including Erection Of Tower, Erection Of Bts Shelter With Available Tower/Bts Materials At Bsnl Stores Including Transportation Of The Material To Site And Providing Bts Bed At New Collect
|
| Description |
Construction Of 40 M Ground Based Tower With Rcc Foundation Including Erection Of Tower, Erection Of Bts Shelter With Available Tower/Bts Materials At Bsnl Stores Including Transportation Of The Material To Site And Providing Bts Bed At New Collect
|
| Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
| Tender Id | 2024_BSNL_207086_1 |
|
Reference Number |
NIT No. 46/NIT/CECTSCZ/HYD/2024-25 |
| Tender Fee | 590 |
| EMD | 29700 |
| Tender Value | - |
| Place | Palwancha |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=226450 |
| Start Date | September 03, 2024 23:50 |
| End Date |
Expired
11/09/2024
Expired 763 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of tower foundation bts platform erection of 40m tower nblw nbfl make at vaious locations aprox 16 nos for kumbh mela at nashik 2027 2nd call
Construction of tower foundation bts platform erection of 40m tower nblw nbfl make at vaious locations aprox 16 nos for kumbh mela at nashik 2027 2nd call
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreConstruction of 40 m ground based tower including rcc foundation, erection of tower with available tower material, erection of bts shelter including foundation and barbed wire fencing with rcc posts etc at nagaram nbsnl_hd5597, vikarabad
Construction of 40 m ground based tower including rcc foundation, erection of tower with available tower material, erection of bts shelter including foundation and barbed wire fencing with rcc posts etc at nagaram nbsnl_hd5597, vikarabad
Read moreErection of 40m (flood light type) narrow base tower including foundation, engine bed,earthing , gantry and erection of bts shelter at vadaseri, thanjavur ba.
Erection of 40m (flood light type) narrow base tower including foundation, engine bed,earthing , gantry and erection of bts shelter at vadaseri, thanjavur ba.
Read moreConstruction of 40 m ground based tower including rcc foundation, erection of tower with available tower material at stores and painting at bsnl compound, kollapur(mb5104) in mahabubnagar oa , medak ba
Construction of 40 m ground based tower including rcc foundation, erection of tower with available tower material at stores and painting at bsnl compound, kollapur(mb5104) in mahabubnagar oa , medak ba
Read moreProviding foundation bed for 40.00 meters height bsnl narrow base tower
Providing foundation bed for 40.00 meters height bsnl narrow base tower at oc premises for establishing communication in sathupalli, kothagudem area, khammam district, telangana state.(invited under earmarked work - sccl registered contractors belongs to sc community only are eligible to participate)
Read moreConstruction of 2 nos tower foundation and bts foundation for 40 metre tower in phase ix.1 in sdca chamorshi under gadchiroli ssa sh c o 01 no. tower foundation bts foundation and tower erection at kalinagar under chamorshi sdca
Construction of 2 nos tower foundation and bts foundation for 40 metre tower in phase ix.1 in sdca chamorshi under gadchiroli ssa sh c o 01 no. tower foundation bts foundation and tower erection at kalinagar under chamorshi sdca
 
Read morePrefabricated bts shelter bsnl site jaganoo to chenani
Dismantling shifting and re-installation of prefabricated bts shelter from bsnl site jaganoo to bts site at chenani udhampur distt udhampur jandk ut
Read morePoviding forset up of bsnl 4g bts tower
Poviding forset up of bsnl 4g bts tower under government
Read moreof your Industry type