Dismantling Of 40 M Ground Base Tower, Gantry Bts Shelter And Foundation At Nbsnl Site At Orathanadu
Description
Dismantling Of 40 M Ground Base Tower, Gantry Bts Shelter And Foundation At Nbsnl Site At Orathanadu
Organisation Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings
Tender Id 2025_BSNL_256232_1
Reference
Number
NIT No. 13/EE/BSNLCD/TRY/2025-26
Tender Fee 590
EMD 4792
Tender Value -
Place TRICHY
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=295438

Start Date November 25, 2025 00:00
End Date
Expired 01/12/2025

Expired 318 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of tower foundation bts platform erection of 40m tower nblw nbfl make at vaious locations aprox 16 nos for kumbh mela at nashik 2027 2nd call

Construction of tower foundation bts platform erection of 40m tower nblw nbfl make at vaious locations aprox 16 nos for kumbh mela at nashik 2027 2nd call

Read more
Dismantling, transportation, design and construction of foundation, erection of 45 m high self-supporting lattice steel tower at akashvani mahabubnagar as per specification

Dismantling, transportation, design and construction of foundation, erection of 45 m high self-supporting lattice steel tower at akashvani mahabubnagar as per specification

Read more
Construction of foundation for 01 no of 100 mva tr and 2 nos of 220 kv gantry tower and other allied civil works at new town iic 220 kv gis under salt lake area office wbsetcl under ace ktz

Construction of foundation for 01 no of 100 mva tr and 2 nos of 220 kv gantry tower and other allied civil works at new town iic 220 kv gis under salt lake area office wbsetcl under ace ktz

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Erection of 40m (flood light type) narrow base tower including foundation, engine bed,earthing , gantry and erection of bts shelter at vadaseri, thanjavur ba.

Erection of 40m (flood light type) narrow base tower including foundation, engine bed,earthing , gantry and erection of bts shelter at vadaseri, thanjavur ba.

Read more
Dismantling of 40 mtr nblw tower and bts shelter along with foundation at asarwa bethak ahmedabad

Dismantling of 40 mtr nblw tower and bts shelter along with foundation at asarwa bethak ahmedabad

Read more
Dismantling 60 m gbt bts tower, pre-fab bts shelter, ic demolishing

Dismantling 60 m gbt bts tower, pre-fab bts shelter, ic demolishing&#x0d all civil constructions like rcc columns, beams and base footing, brick platform,&#x0d boundary wall etc. vacating the site considering the court case at darapur, moga &#x0d in fzr ba

Read more
Construction of 2 no tower foundation bts platform dismantling and erection of 40m gbt steel tower at ntpc township and ntpc plant mouda district nagpur

Construction of 2 no tower foundation bts platform dismantling and erection of 40m gbt steel tower at ntpc township and ntpc plant mouda district nagpur

Read more
Erection of 40m flood light type narrow base tower including providing rcc foundation engine bed earthing and gantry at siddamalli thiruvarur district

Erection of 40m flood light type narrow base tower including providing rcc foundation engine bed earthing and gantry at siddamalli thiruvarur district