Tender Details

Particulars Details
Title
Construction Of New 4 Lane With Paved Shoulder From Dareota Village To Kalar Bala Village Of Nh 205 (Design Chainage Km.33.175 To Km 41.000 Design Length 7.825 Km) Including Twin Tube Tunnel Package Iib In Himachal Pradesh Under Nh (O) On Ham
Description
Construction Of New 4 Lane With Paved Shoulder From Dareota Village To Kalar Bala Village Of Nh 205 (Design Chainage Km.33.175 To Km 41.000 Design Length 7.825 Km) Including Twin Tube Tunnel Package Iib In Himachal Pradesh Under Nh (O) On Ham
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_214953_1
Reference
Number
NHAI/Shimla- Mataur/Pkg-IIB/HAM
Tender Fee 70000
EMD 6.22 Crore
Tender Value -
Place NHAI HQ
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=237415

Start Date November 18, 2024 21:30
End Date
Expired 12/06/2025

Expired 488 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of 6 lane road tunnel for nh 148ae connecting dwarka expressway nh 248bb with nelson mandela marg vasant kunj in the state of delhi on ham mode

Construction of 6 lane road tunnel for nh 148ae connecting dwarka expressway nh 248bb with nelson mandela marg vasant kunj in the state of delhi on ham mode

Read more
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.

Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.

Read more
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

Read more
Develop. of 6l ac gf regional expressway on northern side of hyderabad from pragnapur vill design ch82.000 to tangad palle vill design ch160.000 for a design l of 78.000 km in the state of telangana under nh(o) on ham pkgii

Develop. of 6l ac gf regional expressway on northern side of hyderabad from pragnapur vill design ch82.000 to tangad palle vill design ch160.000 for a design l of 78.000 km in the state of telangana under nh(o) on ham pkgii

Read more
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)

Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)

Read more
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).

Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).

Read more
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.

Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.

Read more
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)

Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise