Tender Details

Particulars Details
Title
Rehabilitation And Upgradation Of Existing 4 L Highway To A 6 L Divided Carriageway Of Jhansi Orai Section (Pkg 2) From Design Km 1423.000 Sultanpura Village To Design Km 1469.000 Near Ingui Khurd Village Nh 27 In Up On Ham Mode. (Tl46.000 Kms).
Description
Rehabilitation And Upgradation Of Existing 4 L Highway To A 6 L Divided Carriageway Of Jhansi Orai Section (Pkg 2) From Design Km 1423.000 Sultanpura Village To Design Km 1469.000 Near Ingui Khurd Village Nh 27 In Up On Ham Mode. (Tl46.000 Kms).
Organisation National Highways Authority of India | Head Office - NHAI | Technical - NHAI
Tender Id Login to view
Reference
Number
Login to view
Tender Fee 1.8 Lakh
EMD 17.12 Crore
Tender Value 1711.7 Crore
Place
Link Login to view
Start Date September 01, 2026 23:10
End Date
Open 21/10/2026

8 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.

Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.

Read more
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)

Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl44.085 kms)

Read more
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of orai barah section of nh27 from ex. km 1515.713 to km 1578.383 in the state of uttar pradesh on ham (total length 62.670 km).

Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of orai barah section of nh27 from ex. km 1515.713 to km 1578.383 in the state of uttar pradesh on ham (total length 62.670 km).

Read more
Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.

Upgradation to 4 lane with paved shoulders with divided carriageway from design km 0.000 to km 37.087 of pardi nh 48 junction sukesh nanapondha kaprada section of nh 848 in the state of gujarat on hybrid annuity mode.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 0.000 to km 77.102 (chitrakoot majhgawan satna section) of nh 135bg (design length 77.102 km) under nh(o) in the state of uttar pradesh and madhya pradesh on ham

Read more
Consultancy services for preparation of dpr for upgradation of nh27 (jhansi orai) from 4 lane to 6 lane divided carriageway in the state of uttar pradesh.

Consultancy services for preparation of dpr for upgradation of nh27 (jhansi orai) from 4 lane to 6 lane divided carriageway in the state of uttar pradesh.

Read more
Consultancy services of independent engineer for upgradation to four lane with paved shoulders divided carriageway from design km 0.000 to km 37.087 of pardi nh-48

Consultancy services of independent engineer for upgradation to four lane with paved shoulders divided carriageway from design km 0.000 to km 37.087 of pardi nh-48 junction-sukesh-nanapondha-kaprada section of nh-848 in the state of gujarat

Read more
4-lane divided carriageway of orai -bhognipur section (km 220.00 to 255.00) on nh-25 and bhognipur barah section (km 421.20 to km 449.00) on nh-2 on bot (annuity) basis in the state of up

4-lane divided carriageway of orai -bhognipur section (km 220.00 to 255.00) on nh-25 and bhognipur barah section (km 421.20 to km 449.00) on nh-2 on bot (annuity) basis in the state of up

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of exis 2l to 4l divided carriageway with ps from km243.800 to km270.500 of nh 39(rewa to churhat tunnel north portal excluding churhat tunnel)and from km286.200 to km 313.700 of nh39(churhat to sidhi sec)l-54.20 km under nh(o) in mp on ham

Widening of exis 2l to 4l divided carriageway with ps from km243.800 to km270.500 of nh 39(rewa to churhat tunnel north portal excluding churhat tunnel)and from km286.200 to km 313.700 of nh39(churhat to sidhi sec)l-54.20 km under nh(o) in mp on ham

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise