Tender Details

Particulars Details
Title
Construction Of M/T, Cd And Balance Work On Sikkan Mutt To Kasan Via Moregaloo Road Km. 0/00 To 3/500 Including One No. Bridge At Rd. 1/170 In Gp Upprali Surari And Bhargaon Under Nabard Ridf Xxix.
Description
Construction Of M/T, Cd And Balance Work On Sikkan Mutt To Kasan Via Moregaloo Road Km. 0/00 To 3/500 Including One No. Bridge At Rd. 1/170 In Gp Upprali Surari And Bhargaon Under Nabard Ridf Xxix.
Organisation PWD | State Govt. and UT
Tender Id 2024_PWD_88457_1
Reference
Number
PW-SE-I-Tender-107-RIDF- XXIX-MDII/24-21252-21301 dt 13-03-2024
Tender Fee 5000
EMD 7.18 Lakh
Tender Value
Place In Mandi Division No.2 HPPWD
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=131345
Start Date March 15, 2024 15:30
End Date

26/03/2024 ( Expired 468 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more
Prov laying of wmm 100mm 2 layer dbm 60mm bc 40mm incl prime tack as per morth spec and rd marking with thermoplastic paint as per irc 35 incl fix of rd stud delinators for surf wk bet km 0 to 3 and km 16 to 24 on n-d rd in 19tf of project dantak

Prov laying of wmm 100mm 2 layer dbm 60mm bc 40mm incl prime tack as per morth spec and rd marking with thermoplastic paint as per irc 35 incl fix of rd stud delinators for surf wk bet km 0 to 3 and km 16 to 24 on n-d rd in 19tf of project dantak

Read more
Construction of lower safru grauru link road gp reur km 0/0 to 2/510 under nabard ridf-xxviii, distt. mandi (hp).

C/o formation cutting 5/7 mtr. wide, dumping sites, retaining walls, breast walls, cross-drainage work km 0/0 to 2/510 and 19.75 mtr rcc box girder bridge at rd 0/975).

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Providing bt road connectivity from 1) kangti pwd road to valu tanda, kishan nayank t gp of sirgapur mandal (0.80 km) 2) pwd road to shyama nayak tanda via daku nayak tanda-rupla tanda of sirgapur mandal (2.50 km) 3) construction of high level bridge on r/f wankdal to gairantanda (local stream) of sirgapur mandal 4) sarpanch thanda to mangali thanda of sirgapur mandal (0.80 km) and 5) didya thanda to langar thanda of sirgapur mandal(1.00 km) in sangareddy district

Providing bt road connectivity from 1) kangti pwd road to valu tanda, kishan nayank t gp of sirgapur mandal (0.80 km) 2) pwd road to shyama nayak tanda via daku nayak tanda-rupla tanda of sirgapur mandal (2.50 km) 3) construction of high level bridge on r/f wankdal to gairantanda (local stream) of sirgapur mandal 4) sarpanch thanda to mangali thanda of sirgapur mandal (0.80 km) and 5) didya thanda to langar thanda of sirgapur mandal(1.00 km) in sangareddy district

Read more
M/t on tailing yuramurti road upto sarkhang, rancha, khurched, kogma and gompa km. 0/0 to 4/300). (sh - providing and laying primer coat, tack coat, premix carpet and seal coat in km. 2/500 to 4/00

M/t on tailing yuramurti road upto sarkhang, rancha, khurched, kogma and gompa km. 0/0 to 4/300). (sh - providing and laying primer coat, tack coat, premix carpet and seal coat in km. 2/500 to 4/00

Read more
Construction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran

Construction of high level bridge 2 span 9.0m each effective over kairon drain on link road patti to harike khalra road via kulla manihala jai singh at rd 3200 m including approaches and di pb-22-027a pmgsy-iii in distt. tarn taran

Read more
Balance work of road from jabri to mohalla bajjarana via pyt bachanwali tehsil surankote district poonch km 1st rd 0 to km 2nd rd 1000 by way of earth work in cutting cross drinage.walling providing and laying 150mm thick wbm grade-ii,75mm thick gr

Balance work of road from jabri to mohalla bajjarana via pyt bachanwali tehsil surankote district poonch km 1st rd 0 to km 2nd rd 1000 by way of earth work in cutting cross drinage.walling providing and laying 150mm thick wbm grade-ii,75mm thick gr

Read more
A/r and m/o on nh 72 new nh 07 kala amb paonta sahib dehradun road km 46/00 to 103/00 sh construction of damaged rcc railing on markanda bridge at rd 64/780.50 to 64/803 r.h.s.

A/r and m/o on nh 72 new nh 07 kala amb paonta sahib dehradun road km 46/00 to 103/00 sh construction of damaged rcc railing on markanda bridge at rd 64/780.50 to 64/803 r.h.s.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise