Tender Details

Particulars Details
Title
Hcp2/nit-04e/5thsfc/24-25_5
Description
Construction of cc road from esha land to khopakati kabarsthan under islampur gp within hcpur-ii ps
Organisation DISTRICT MAGISTRATE MALDA | State Govt. and UT
Tender Id 2024_DMM_714513_1
Reference
Number
HCP2/NIT-04e/5thSFC/24-25_5
Tender Fee 0
EMD 5000
Tender Value
Place HCPur-II Dev. Block
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1569716
End Date

23/07/2024 ( Expired 82 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Tender for road transportation of bulk pol products (ms /hsd /branded fuels etc.) by bottom loading tank lorries from bpcl ennore coastal installation, tamil nadu to various locations (depots/retail outlets/ direct customers, etc.) within state (ws) and outside state (os)

Tender for road transportation of bulk pol products (ms /hsd /branded fuels etc.) by bottom loading tank lorries from bpcl ennore coastal installation, tamil nadu to various locations (depots/retail outlets/ direct customers, etc.) within state (ws) and outside state (os)

Read more
Construction of 4 lane with paved shoulders bypass to nalgonda town from design km 0.000 to km 14.000 length 14.00km existing ch km 18 710 to 28 685 of nakrekal to nagarjuna sagar section of nh 565 in the state of telangana on epc mode under annual

Construction of 4 lane with paved shoulders bypass to nalgonda town from design km 0.000 to km 14.000 length 14.00km existing ch km 18 710 to 28 685 of nakrekal to nagarjuna sagar section of nh 565 in the state of telangana on epc mode under annual

Read more
Construction of drain ugd 24th bobbili ramesh

Construction sullage drain from bobbli ramesh house to ghr colony excting mh in ward no.24 shadnagar municipality under municipal general funds 2024-25

Read more
Construction of 4 lane access controlled greenfield highway from shardulla (khunti) to sithiyo (ranchi) of nh 143d ing from km 127.500 to km 150.300 (length 22.800 km) on ham under nh(o) in the state of jharkhand (package v)

Construction of 4 lane access controlled greenfield highway from shardulla (khunti) to sithiyo (ranchi) of nh 143d ing from km 127.500 to km 150.300 (length 22.800 km) on ham under nh(o) in the state of jharkhand (package v)

Read more
Construction of four lane access controlled greenfield highway from latra to shardulla of nh 143d ing from km 103.000 to km 127.500 (length 24.500 km) on hybrid annuity mode (ham) under nh(o) in the state of jharkhand (package iv)

Construction of four lane access controlled greenfield highway from latra to shardulla of nh 143d ing from km 103.000 to km 127.500 (length 24.500 km) on hybrid annuity mode (ham) under nh(o) in the state of jharkhand (package iv)

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Construction of four/six lane greenfield connectivity from talwara jattan village on nh44 to gobindsar village on delhi amritsar - katra expressway from km 0.000 to km 12.345 (pathankot link road) in punjab on epc mode under nh(o)

Construction of four/six lane greenfield connectivity from talwara jattan village on nh44 to gobindsar village on delhi amritsar - katra expressway from km 0.000 to km 12.345 (pathankot link road) in punjab on epc mode under nh(o)

Read more
Construction and upgradation of existing 2 lane to 4 lane dual carriageway nh standard from pandach to manigam of nh-1 (from existing chainage km17.974 to km29.792) as a part of srinagar ring road phase-iia on epc mode under bmp in the ut of jandk

Construction and upgradation of existing 2 lane to 4 lane dual carriageway nh standard from pandach to manigam of nh-1 (from existing chainage km17.974 to km29.792) as a part of srinagar ring road phase-iia on epc mode under bmp in the ut of jandk

Read more
Construction on major bridge on bori river at ch.98.020 along with approaches from km 97.600 to km 98.350 total length of the project 0.750 km on akkalkot gangapur

Construction on major bridge on bori river at ch.98.020 along with approaches from km 97.600 to km 98.350 total length of the project 0.750 km on akkalkot gangapur&#x0d road of nh 150e on epc mode in the state of maharashtra&#x0d

Read more
Installation of metal beam crash barrier on nh 66 from km 165.100 ex.ch.332.170 to km 302/720 ex.ch. 471.330 in watul .patradevi section under road safety annual plan in ratnagiri and sindhudurg district in the state of maharashtra

Installation of metal beam crash barrier on nh 66 from km 165.100 ex.ch.332.170 to km 302/720 ex.ch. 471.330 in watul .patradevi section under road safety annual plan in ratnagiri and sindhudurg district in the state of maharashtra

Read more

No attachments found

Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise