Tender Details

About Tender

🏭 Procurement Opportunity: Integrated Pyrolysis And Reformer Reactor Set Up 🏭 The Indian Institute Of Technology Roorkee, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Bids For The Procurement Of An Integrated Pyrolysis And Reformer Reactor Set Up. 📅 Bid Submission Deadline: July 19, 2024, 3:00 Pm A Tender Fee Of Inr 52,000/ Is Applicable As An Earnest Money Deposit (Emd). Interested Bidders Must Submit Detailed Technical And Financial Bids, Demonstrating Their Capability To Deliver A High Performance, Integrated System That Meets The Project Specifications. Keywords: Integrated Pyrolysis, Reformer Reactor, Iit Roorkee, Central Government, Procurement, Bid, Emd, Chemical Engineering Equipment
Particulars Details
Title
Integrated Pyrolysis And Reformer Reactor Set Up
Description
Integrated Pyrolysis And Reformer Reactor Set Up
Organisation Indian Institute of Technology Roorkee | Central Govt. Ministry/Department
Tender Id 2024_IITR_814084_1
Reference
Number
2024250085/MM-24/CHEMICAL/81
Tender Fee 0
EMD 5200
Tender Value
Place IIT Roorkee
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=868821
Start Date September 24, 2024 20:30
End Date

10/10/2024 ( Expired 246 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Integrated development of chandrika and gs49 project

Offshore installation and onshore works of &#x0d integrated development of chandrika and gs49 project

Read more
Design and construction of civil, structural, architecture, mep, hvac, lifts, landscaping and all associated works for establishment of integrated bus terminal cum commercial office development at vadapalani bus depot

Design and construction of civil, structural, architecture, mep, hvac, lifts, landscaping and all associated works for establishment of integrated bus terminal cum commercial office development at vadapalani bus depot

Read more
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Read more
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.

Read more
Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.

Construction and up- gradation to two lane with paved shoulder in km 98.160 to 105.330 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-2) in the state of chhattisgarh.

Read more
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Read more
Performance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le

Performance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le

Read more
Selection of epc contractor for integrated manufacturing cluster imc palakkad

Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.

Read more
Consultancy service for authority engineer for supervision of up-gradation to two lane with paved shoulder from design chainage km. 118.813 to km. 148.810 and km. 155 to km. 165.082 of nh-351 in the state of gujarat

Consultancy service for authority engineer for supervision of up-gradation to two lane with paved shoulder from design chainage km. 118.813 to km. 148.810 and km. 155 to km. 165.082 of nh-351 in the state of gujarat

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise