Tender Details

Particulars Details
Title
Selection Of Epc Contractor For Integrated Manufacturing Cluster Imc Palakkad
Description
Rfq Cum Rfp For Design, Construction, Testing, Commissioning And Operation And Maintenance Of Infrastructure Works At Pudussery Central And Kannambra Of Palakkad Node Under Extension Of Chennai Bengaluru Industrial Corridor Cbic On Epc Basis.
Organisation The Kerala Industrial Corridor Development Corporation Limited | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 1.3 Lakh
EMD 28 Crore
Tender Value
Place Palakkad, Kerala
Link

AAAAAAAAAA

Login to view
Start Date July 04, 2025 14:30
End Date

14/07/2025 ( 24 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Selection of consultant for independent safety assessment (isa) of mumbai-ahmedabad high speed rail (mahsr) project

Selection of consultant for independent safety assessment (isa) of mumbai-ahmedabad high speed rail (mahsr) project

Read more
Rfp for selection of solution provider for digital regulatory reporting (drr) solution of ifsca

Rfp for selection of solution provider for digital regulatory reporting (drr) solution of ifsca

Read more
Package m16 - design, manufacturing, supply, testing and commissioning of catenary maintenance vehicle for delhi ghaziabad-meerut namo bharat corridor.

Package m16 - design, manufacturing, supply, testing and commissioning of catenary maintenance vehicle for delhi ghaziabad-meerut namo bharat corridor.

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)

Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from pragnapur vill (dc. 82.000) to rayagiri vill (dc. 125.000) for a design length of 43.000 km in telangana under nh(o) on epc mode (package iv)

Read more
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Eoi for selection of service provider for supply, development, installation, integration, migration, maintenance and support of insurance management solution (ims) to department of posts

Eoi for selection of service provider for supply, development, installation, integration, migration, maintenance and support of insurance management solution (ims) to department of posts

Read more
Selection of nabl accredited labs

Selection of labs recognised under environment (protection) act, 1986 and nabl accredited laboratories for environment monitoring, preparing and uploading of six monthly compliance report for environmental clearance

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise