Tender Details

Particulars Details
Title
Ie For Upgradation Of Existing 2 Lane Carriageway To 4 Lane Divided Carriageway From Ch. 330.800 In Karanjveri Vil. In Dharampur Taluka To Ch. 372.185 In Karvad Vil. Vapi, Post Jun. With Mve Length 41.385 Section Of Nh 56 In Gujarat On Ham Pkg Ix
Description
Ie For Upgradation Of Existing 2 Lane Carriageway To 4 Lane Divided Carriageway From Ch. 330.800 In Karanjveri Vil. In Dharampur Taluka To Ch. 372.185 In Karvad Vil. Vapi, Post Jun. With Mve Length 41.385 Section Of Nh 56 In Gujarat On Ham Pkg Ix
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2022_NHAI_133098_1
Reference
Number
Tender Fee 5000
EMD 0
Tender Value 0
Place NHAI HQ
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=145564
Start Date October 21, 2022 23:30
End Date

22/01/2024 ( Expired 530 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode

Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode

Read more
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Read more
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Read more
Consultancy services for preparation of dpr for widening to 4 lane divided carriageway of chhapra gopalganj section of nh-85 in the state of bihar

Consultancy services for preparation of dpr for widening to 4 lane divided carriageway of chhapra gopalganj section of nh-85 in the state of bihar

Read more
Rehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).

Rehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).

Read more
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Read more
Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Rfp for construction of 4 lane jaunpur bypass from km 80.220 to km 107.780 of nh 135a pkg i (jaunpur akbarpur section) in the state of uttar pradesh on ham mode.

Read more
Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham

Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham

Read more
Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Read more
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450

Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise