Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Manning Of Track At Shaktinagar Line 2 (Km 32/00 To Diamond Point) For
|
| Description |
Manning Of Track At Shaktinagar Line 2 (Km 32/00 To Diamond Point) For Ntpc Rihand.
|
| Organisation | NTPC Limited | Public Sector Undertakings |
| Tender Id | 2025_NTPC_97299_1 |
|
Reference Number |
NTPC/Rihand STPS/9900300424 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | Rihand Superthermal Power P.O RIHANDNAGAR, DIST. S |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=100509 |
| Start Date | May 26, 2025 18:30 |
| End Date |
Expired
02/06/2025
Expired 398 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bina- planning, designing, drawing & construction of ballastless track(up to 50 kmph speed) at bina station loop line number 1 and 2
For complete deion and other details, please refer to tender
Read moreProcurement of hydraulic adapter etc., for track machine.
For complete deion and other details, please refer to tender
Read more7) construction of bt road gandher to chacha khedi km 2/0 to 3/00
7) construction of bt road gandher to chacha khedi km 2/0 to 3/00
Read moreHyderabad division: sw(i) sc-mue section: proposed construction of 2 lane rob in lieu of lc no.180 at rly km 422/1-2 of span 1x36.00 m composite girder between dab-bsx stations on mue-sc section of hyb division - deposit work sw(ii) hyb div: sc-mue section: proposed construction of 2 lane rob at rly km 418/0-1 of span 1x36.00 m composite girder between kek- dab stations on mue-sc section on sh/mdr at km 1002.9 at atkur side road bypass near dharmabad-deposit work. - electrical trd arrang
For complete deion and other details, please refer to tender
Read moreProvn of direct pumping line from 32 jcos pump house to p-71 and p-27 jcos accn and connected works at asc centre (sounth) pump house under ge (central) bengalore
Provn of direct pumping line from 32 jcos pump house to p-71 and p-27 jcos accn and connected works at asc centre (sounth) pump house under ge (central) bengalore
Read moreReplacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Replacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Read moreRepair of viaduct walkway and subsequent painting with anti-carbonation paint from qutub minar to millennium city centre gurugram metro stations of line-2 (2 years).
Repair of viaduct walkway and subsequent painting with anti-carbonation paint from qutub minar to millennium city centre gurugram metro stations of line-2 (2 years).
Read moreEngagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Read moreEngagement of user fee agency through e-quotation for shahbpur fee plaza at km 5.925 for the section from km.0.000 to km. 43.000(barabanki-jarwal section) of nh-28c in the state of uttar-pradesh
Engagement of user fee agency through e-quotation for shahbpur fee plaza at km 5.925 for the section from km.0.000 to km. 43.000(barabanki-jarwal section) of nh-28c in the state of uttar-pradesh
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreof your Industry type