Tender Details
Particulars | Details |
---|---|
Title |
Labour And Cartage Work
|
Description |
Labour And Cartage Work
|
Organisation | Department of Food Civil Supplies and Consumer Affairs | State Govt. and UT |
Tender Id | 2024_FCSCA_127738_1 |
Reference Number |
JAL/A-6/2024/L and C/3 |
Tender Fee | 4360 |
EMD | 9.05 Lakh |
Tender Value | |
Place | LABOUR AND CARTAGE WORK |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=259401 |
Start Date | September 21, 2024 22:50 |
End Date |
24/09/2024 ( Expired 240 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Selection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreProcurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Procurement of advanced high energy linear accelerator la system 02 set under buyback basis with turnkey work
Read moreDesign and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Design and construction of elevated metro viaduct of length 20.527 kms between ug ramp and balkum naka including depot approach viaduct and three special spans for thane integral ring metro project.
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreSupply, installation, testing and commissioning of grid connected rooftop and ground mounted solar power plants on government buildings
Supply, installation, testing and commissioning of grid connected rooftop and ground mounted solar power plants on government buildings
Read moreOperations and maintenance of integrated cold chain infrastructure for preservation and value addition at parala and farm level infrastructure at kharapathar, himachal pradesh on omt mode
Operations and maintenance of integrated cold chain infrastructure for preservation and value addition at parala and farm level infrastructure at kharapathar, himachal pradesh on omt mode
Read moreof your Industry type