Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rehabilitation And Up Gradation To 2 Lane With Paved Shoulder Configuration For The Work Of Charthana Jintur Section Of Nh 752 I From Design Km.25 100 To 47 100 Design Length 22 00 Km In The State Of Maharashtra On Epc Mode
|
| Description |
Rehabilitation And Up Gradation To 2 Lane With Paved Shoulder Configuration For The Work Of Charthana Jintur Section Of Nh 752 I From Design Km.25 100 To 47 100 Design Length 22 00 Km In The State Of Maharashtra On Epc Mode
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_830341_1 |
|
Reference Number |
EENH/Jalna/Tender/NIT No-06/1644 |
| Tender Fee | 20000 |
| EMD | 1.72 Crore |
| Tender Value | |
| Place | Jalna |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=872537 |
| Start Date | October 11, 2024 14:30 |
| End Date |
Expired
07/07/2025
Expired 363 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration of velapur mahud section of nh 965g design chainage from km 10/500 to km 32/300 in the state of maharashtra on epc mode.
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration of velapur mahud section of nh 965g design chainage from km 10/500 to km 32/300 in the state of maharashtra on epc mode.
Read moreRehabilitation and up-gradation of jarud - sirsala section of nh-361f km 59.500 to km115.00 to two lane with paved shoulder/ four lane in the state of maharashtra on epc mode.
Rehabilitation and up-gradation of jarud - sirsala section of nh-361f km 59.500 to km115.00 to two lane with paved shoulder/ four lane in the state of maharashtra on epc mode.
Read moreUp gradation to two four lane with paved shoulder configuration of nh 652 from tuljapur naldurge akkalkot road chainage from km 00.000 to km 30.982 in the state of maharashtra on epc mode length 30.982km
Up gradation to two four lane with paved shoulder configuration of nh 652 from tuljapur naldurge akkalkot road chainage from km 00.000 to km 30.982 in the state of maharashtra on epc mode length 30.982km
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreRehabilitation up-gradation to 2 lanes with paved shoulder 4 laning configuration of rajur chanegaon chikhli section of nh.752.h from km. 188.280 to km.179.430 design chainage from km. 0.000 to km. 8.850 length-8.850 km. in the state of maharashtra
Rehabilitation up-gradation to 2 lanes with paved shoulder 4 laning configuration of rajur chanegaon chikhli section of nh.752.h from km. 188.280 to km.179.430 design chainage from km. 0.000 to km. 8.850 length-8.850 km. in the state of maharashtra
Read moreof your Industry type