Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rehabilitation And Up Gradation To 2 Lane With Paved Shoulder Configuration Of Velapur Mahud Section Of Nh 965 G Design Chainage From Km 10/500 To Km 32/300 In The State Of Maharashtra On Epc Mode.
|
| Description |
Rehabilitation And Up Gradation To 2 Lane With Paved Shoulder Configuration Of Velapur Mahud Section Of Nh 965 G Design Chainage From Km 10/500 To Km 32/300 In The State Of Maharashtra On Epc Mode.
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_788316_1 |
|
Reference Number |
NHD/TC/02/2024 Dt 01/01/2024 |
| Tender Fee | 10000 |
| EMD | 85 Lakh |
| Tender Value | - |
| Place | Solapur |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=828605 |
| Start Date | January 02, 2024 19:30 |
| End Date |
Expired
26/02/2024
Expired 961 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreUp gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Up gradation to two/four lane with paved shoulder configuration of tuljapur naldurge akkalkot road from naldurge to akkalkot of bvalance work from ch 30.884 and ch. 70.800 of nh 652 on epc mode in the state of maharashtra
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreBalance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for proper
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Widening to 2 lane with paved shoulder from existing chainage 12.00 to 40.50 (badwala to lakhwar bend) (realignment from km 12.00 to 31.122) on nh-507
Read moreConsultancy services for authoritys engineer for supervision of balance work of the rehabilitation and upgradation from km 33.860 to km 67.150 of the naldurge to akkalkot section of nh 652 to 2 lane with paved shoulder configuration in the state of m
Consultancy services for authoritys engineer for supervision of balance work of the rehabilitation and upgradation from km 33.860 to km 67.150 of the naldurge to akkalkot section of nh 652 to 2 lane with paved shoulder configuration in the state of m
Read moreConstruction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode
Construction of alirajpur bypass (2-lane with paved shoulder) from ch. 0.000 to ch. 11.792 in the state of madhya pradesh (total length-11.792 kms) under epc mode.
Read moreWidening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Widening and strengthening of single and intermediate lane to 2 lane with paved shoulder from existing chainage (km 53.873 to km 59.700) design chainage (km 33.565 to km 38.943) (design length 5.378 km) on nh-507 in the state of uttarakhand
Read moreUpgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Upgradation and reconstruction of khandwa-mundi road (sh-70) from km 00 to km 31.275 two lane with paved shoulder in the state of madhya pradesh on epc mode.
Read moreof your Industry type