Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Ae For Supervision Of Imp. And Upgradation To 2 Lane With Ps Configuration From Existing Km 7.410 To Km56.245(design Chainage Km0.000 To Km49.235) Hadia Chauraha To Karmaini Ghat Section Of Nh328 In The State Of Up On Epc Mode
|
| Description |
Consultancy Services For Ae For Supervision Of Imp. And Upgradation To 2 Lane With Ps Configuration From Existing Km 7.410 To Km56.245(design Chainage Km0.000 To Km49.235) Hadia Chauraha To Karmaini Ghat Section Of Nh328 In The State Of Up On Epc Mode
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 5000 |
| EMD | 10 Lakh |
| Tender Value | |
| Place | Sant Kabir Nagar |
| Link | Login to view |
| Start Date | June 19, 2026 00:25 |
| End Date |
Open
03/08/2026
45 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreRfp for the work of improvement and upgradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.25(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh328 in the state of utter pradesh on
Rfp for the work of improvement and upgradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.25(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh328 in the state of utter pradesh on
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreConsultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Read moreRehabilitation and upgradation of single / intermediate lane to 2 lane from existing chainage (km 64.525 to km 74.700) design chainage (km 43.400 to km 53.365) on nh -123 (new nh no. 507) under epc mode in the state uttarakhand
Rehabilitation and upgradation of single / intermediate lane to 2 lane from existing chainage (km 64.525 to km 74.700) design chainage (km 43.400 to km 53.365) on nh -123 (new nh no. 507) under epc mode in the state uttarakhand
Read moreConsultancy services for authority engineer/ pmc for supervision of rehabilitation and up- gradation from km. 51.600 to km. 75.700 of nh 321g (nuhkhas to etah section) to two lane with paved shoulder configuration under epc mode in the state of up
Consultancy services for authority engineer/ pmc for supervision of rehabilitation and up- gradation from km. 51.600 to km. 75.700 of nh 321g (nuhkhas to etah section) to two lane with paved shoulder configuration under epc mode in the state of u
Read moreConsultancy services for ae for rehabilitaion and upgradation 2_4 lane with paved shoulder configuration for the work of gangakhed palam loha road nh361f from km 169.00 to 210.00 desigh chainage km 30.400 to 71.400 in state of maharashtra on epc mode
Consultancy services for ae for rehabilitaion and upgradation 2_4 lane with paved shoulder configuration for the work of gangakhed palam loha road nh361f from km 169.00 to 210.00 desigh chainage km 30.400 to 71.400 in state of maharashtra on epc mode
Read moreof your Industry type