| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Authority Engineer/ Pmc For Supervision Of Rehabilitation And Up Gradation From Km. 51.600 To Km. 75.700 Of Nh 321 G (Nuhkhas To Etah Section) To Two Lane With Paved Shoulder Configuration Under Epc Mode In The State Of Up
|
| Description |
Consultancy Services For Authority Engineer/ Pmc For Supervision Of Rehabilitation And Up Gradation From Km. 51.600 To Km. 75.700 Of Nh 321 G (Nuhkhas To Etah Section) To Two Lane With Paved Shoulder Configuration Under Epc Mode In The State Of U
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_751827_1 |
|
Reference Number |
761M/13M-NHCK/23 Dated 03.06.2023 |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | - |
| Place | SE NH Circle PWD, Kanpur |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | May 05, 2023 15:30 |
| End Date |
Expired
05/07/2023
Expired 1198 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for ae for supervision of rehabilitation and upgradation from km. 0.000 to km. 51.600 of nh321g (agra (junction on nh509 at tedhi baghia) to nuhkhas) to 2 lane with ps configuration in the state of uttar pradesh on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation from km. 0.000 to km. 51.600 of nh321g (agra (junction on nh509 at tedhi baghia) to nuhkhas) to 2 lane with ps configuration in the state of uttar pradesh on epc mode.
Read moreConsultancy services for authoritys engineer for supervision of balance work of the rehabilitation and upgradation from km 33.860 to km 67.150 of the naldurge to akkalkot section of nh 652 to 2 lane with paved shoulder configuration in the state of m
Consultancy services for authoritys engineer for supervision of balance work of the rehabilitation and upgradation from km 33.860 to km 67.150 of the naldurge to akkalkot section of nh 652 to 2 lane with paved shoulder configuration in the state of m
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Rehabilitation and upgradation of nh 548b from km 289.300 to km 342.890 maharashtra karnataka border to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 52.556 km
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreWidening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Widening and upgradation of sirmour (keoti) to kalwari section of nh-135bd from ch 10/070 to 35/920 (length 25.85 km) to 2-lane with paved shoulder configuration in the state of madhya pradesh
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 0.000 (tansen chowk purani chhawani gwalior) to km 77.000 (near village prithvipur) of nh719 in madhya pradesh on hybrid annuity mode (package1).
Read moreBalance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for proper
Balance work under risk and cost for up gradation of paithan pategaon mungi hatgaon bodhegaon ladjalgaon ghogaspargaon phulsangvi ukhandachakla dahiwandi shirur to 2 lane with paved shoulder 4 lane configuration package 55 937 km for
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
Construction and upgradation of existing 2l.ps to 4l with paved shoulder configuration from km 77.000 (near village prithvipur) to km 116.200 (mp/up border near village barahi) of nh-719 in madhya pradesh on hybrid annuity mode (package2).
Read moreof your Industry type