Tender Details
Particulars | Details |
---|---|
Title |
Periodical Maintenance For The Work Pwd Road To Jadamara Or 15 370 B And Khikshabhata To Balapadar Or 15 391
|
Description |
Periodical Maintenance For The Work Pwd Road To Jadamara Or 15 370 B And Khikshabhata To Balapadar Or 15 391
|
Organisation | Government of Odisha |
Tender Id | 2023_CERWI_98739_7 |
Reference Number |
BPT/Online-40/2023-24 |
Tender Fee | 10000 |
EMD | 1.4 Lakh |
Tender Value | |
Place | O/o the CCE RW Circle, Bhawanipatna |
Link | https://tendersodisha.gov.in |
Start Date | December 22, 2023 23:30 |
End Date |
06/01/2024 ( Expired 503 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreBiennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps
Biennial rc for repairing of coal bunker (as and when required basis) under boiler maintenance department of unit-3 to 6, ktps
Read moreSitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Read morePeriodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Read moreShort term maintenance contracts from km 308/4 - 309/815, km 312/0 - 316/0 and km 324/4 -328/2 of nh 948 - bangalore -sathyamangalam -coimbatore road in the state of tamil nadu for the year 2024-25
Short term maintenance contracts from km 308/4 - 309/815, km 312/0 - 316/0 and km 324/4 -328/2 of nh 948 - bangalore -sathyamangalam -coimbatore road in the state of tamil nadu for the year 2024-25
Read moreof your Industry type