Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 6 Lane Zirakpur Bypass (Pkg I) (Ing From Junction With Nh7 (Zirakpur Patiala) (Design Ch. 0.000) And Ending At (Design Ch. 8.500) Near Kishanpura (Total Length 9.800 Km) In Punjab Under Nh (O) On Ham
|
| Description |
Construction Of 6 Lane Zirakpur Bypass (Pkg I) (Ing From Junction With Nh7 (Zirakpur Patiala) (Design Ch. 0.000) And Ending At (Design Ch. 8.500) Near Kishanpura (Total Length 9.800 Km) In Punjab Under Nh (O) On Ham
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_214662_1 |
|
Reference Number |
NHAI/PB/ ZirakpurBypass/Pkg 1/2024 |
| Tender Fee | 40000 |
| EMD | 3.5 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=237027 |
| Start Date | November 14, 2024 23:30 |
| End Date |
Expired
01/01/2025
Expired 652 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreDevelopment of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km
Development of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km
Read moreDevelopment of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package8) (design length 43.500 km.).
Development of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package8) (design length 43.500 km.).
Read moreDevelop. of high speed ac gf corridor from shamli gorakhpur from ch. 579.950 to ch.662.400 in the state of uttar pradesh on ham mode package-11 design length 82.450 km
Develop. of high speed ac gf corridor from shamli gorakhpur from ch. 579.950 to ch.662.400 in the state of uttar pradesh on ham mode package-11 design length 82.450 km
Read moreDevelopment of high speed access controlled greenfield highway from shamli-gorakhpur from ch. 662.400 to ch.745.594 in the state of uttar pradesh on ham mode (package-12) (design length 83.194 km)
Development of high speed access controlled greenfield highway from shamli-gorakhpur from ch. 662.400 to ch.745.594 in the state of uttar pradesh on ham mode (package-12) (design length 83.194 km)
Read moreDevelopment of high-speed access controlled greenfield corridor from shamli-gorakhpur from ch. 510.700 to ch.579.950 in the state of uttar pradesh on ham mode (package-10) (design length 69.25 km.)
Development of high-speed access controlled greenfield corridor from shamli-gorakhpur from ch. 510.700 to ch.579.950 in the state of uttar pradesh on ham mode (package-10) (design length 69.25 km.)
Read moreConsultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read moreConstruction of six lane access controlled amaravati outer ring road from kolavennu to kornepadu on ham in andhra pradesh. package 3 (from design ch. km. 83.000 to 133.500) (narakoduru spur from design km.0.000 to km.5.300)
Construction of six lane access controlled amaravati outer ring road from kolavennu to kornepadu on ham in andhra pradesh. package 3 (from design ch. km. 83.000 to 133.500) (narakoduru spur from design km.0.000 to km.5.300)
Read moreIe services for const of 6l gf ac indore eastern bypass starting from design km 64.000 near pirkaradiya vill and ending at design km 113.000 on nh 347bg near vill simrol datoda pkg1 of indore n dewas district in mp on ham mode l 49.00 km
Ie services for const of 6l gf ac indore eastern bypass starting from design km 64.000 near pirkaradiya vill and ending at design km 113.000 on nh 347bg near vill simrol datoda pkg1 of indore n dewas district in mp on ham mode l 49.00 km
Read moreConstruction of six lane access controlled amaravati outer ring road from kornepadu to kanchikacherla on ham in andhra pradesh. package 4 (from design ch. km. from km.133.500 to km.189.000)
Construction of six lane access controlled amaravati outer ring road from kornepadu to kanchikacherla on ham in andhra pradesh. package 4 (from design ch. km. from km.133.500 to km.189.000)
Read moreof your Industry type