Tender Details

Particulars Details
Title
Const Of 4lane Access Controlled Gf Highway From Kereya To Latra Sec Of Nh 143 D Ing From Design Ch.28.953 To Ch 103.000 L74.047 Km On Ham In The State Of Jharkhand Pkgii
Description
Const Of 4lane Access Controlled Gf Highway From Kereya To Latra Sec Of Nh 143 D Ing From Design Ch.28.953 To Ch 103.000 L74.047 Km On Ham In The State Of Jharkhand Pkgii
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_220263_1
Reference
Number
NHAI/11012/JH/ Kereya-Latra/ NH-143D/2024
Tender Fee 2.1 Lakh
EMD 20.51 Crore
Tender Value
Place NHAI HQ
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=244784
Start Date December 19, 2024 14:30
End Date

27/03/2025 ( Expired 101 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod

Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod

Read more
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Consultancy services for rectification measures on mahadevpur to bhupalapally section 2lps of nh 353c from km 25.0 to 59.2 design ch. km.25.467 to 59.200 and dpr for parkal bypass, bhupalapally bypass on sironcha atmakur section of nh 353c

Consultancy services for rectification measures on mahadevpur to bhupalapally section 2lps of nh 353c from km 25.0 to 59.2 design ch. km.25.467 to 59.200 and dpr for parkal bypass, bhupalapally bypass on sironcha atmakur section of nh 353c

Read more
Develop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km

Develop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise