Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Four Laning Of Keyondpani To Latra Section Of Nh 143 D Ing From Km 59.300 (Design Chainage) To Km 103.000 (Design Chainage) (Length 43.7 Km) On Hybrid Annuity Mode (Ham) Under Bharatmala Pariyojana In Jharkhand (Package Iii)
|
| Description |
Four Laning Of Keyondpani To Latra Section Of Nh 143 D Ing From Km 59.300 (Design Chainage) To Km 103.000 (Design Chainage) (Length 43.7 Km) On Hybrid Annuity Mode (Ham) Under Bharatmala Pariyojana In Jharkhand (Package Iii)
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2023_NHAI_172381_1 |
|
Reference Number |
|
| Tender Fee | 90000 |
| EMD | 8.66 Crore |
| Tender Value | |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=188842 |
| Start Date | October 28, 2023 14:30 |
| End Date |
Expired
11/03/2024
Expired 836 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreConstruction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreFour laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreFour laning of latra to ranchi (sithiyo) section of nh 143d ing from km 103.000 (design chainage) to km 149.950 (design chainage) (length 46.95 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package iv)
Four laning of latra to ranchi (sithiyo) section of nh 143d ing from km 103.000 (design chainage) to km 149.950 (design chainage) (length 46.95 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package iv)
Read moreFour laning of kereya to keyondpani section of nh 143d ing from km 28.953 (design chainage) to km 59.300 (design chainage) (length 30.347 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package ii)
Four laning of kereya to keyondpani section of nh 143d ing from km 28.953 (design chainage) to km 59.300 (design chainage) (length 30.347 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package ii)
Read moreConstruction of four lane access controlled greenfield highway from keyondpani to latra section of nh 143d ing from dc 59.300 to dc 103.000 on hybrid annuity mode (ham) in the state of jharkhand (package iii)
Construction of four lane access controlled greenfield highway from keyondpani to latra section of nh 143d ing from dc 59.300 to dc 103.000 on hybrid annuity mode (ham) in the state of jharkhand (package iii)
Read moreof your Industry type