Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Four Laning Of Rajapalayam To Senkottai Section Of Nh744 From Km.71.600 To Km 107.000 (Design Chainage) Under Bharatmala Pariyojana On Ham Mode In The State Of Tamil Nadu (Package 1).
|
| Description |
Four Laning Of Rajapalayam To Senkottai Section Of Nh744 From Km.71.600 To Km 107.000 (Design Chainage) Under Bharatmala Pariyojana On Ham Mode In The State Of Tamil Nadu (Package 1).
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2022_NHAI_136567_1 |
|
Reference Number |
- |
| Tender Fee | 1.1 Lakh |
| EMD | 10.9 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=149211 |
| Start Date | November 26, 2022 00:25 |
| End Date |
Expired
14/03/2024
Expired 945 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services as ie during operation and maintenance for 6l of chittoor-thatchur highway from km 0.000 (varadharajula) to km 61.380 (veera kaveri rajapuram) under bharatmala pariyojana in the state of ap and tm on ham mode.
Consultancy services as ie during operation and maintenance for 6l of chittoor-thatchur highway from km 0.000 (varadharajula) to km 61.380 (veera kaveri rajapuram) under bharatmala pariyojana in the state of ap and tm on ham mode.
Read moreBalance work of six laning of kagal satara section of nh 48 (old nh 4) package i from km 592.500 to km 658.000 in the state of maharashtra to be executed on epc mode under bharatmala pariyojana
Balance work of six laning of kagal satara section of nh 48 (old nh 4) package i from km 592.500 to km 658.000 in the state of maharashtra to be executed on epc mode under bharatmala pariyojana
Read moreConsultancy services as ie during operation and maintenance for supervision of 4l from madanapalle-pileru (km 0.000-km.55.900), pileru-bhakrapeta (km.55.900-km.74.000) sect. of nh-71 from km.0.000-km.74.000 under bharatmala pariyojana in ap on ham
Consultancy services as ie during operation and maintenance for supervision of 4l from madanapalle-pileru (km 0.000-km.55.900), pileru-bhakrapeta (km.55.900-km.74.000) sect. of nh-71 from km.0.000-km.74.000 under bharatmala pariyojana in ap on ham
Read moreMetal beam crash barrier mbcb work for four laning of dhangaon to boregaon section of nh347bg and nh753l from km 81.000 to 139.000 design length 58 km under bharatmala pariyojana in the state of madhya pradesh on hybrid annuity mode
Metal beam crash barrier mbcb work for four laning of dhangaon to boregaon section of nh347bg and nh753l from km 81.000 to 139.000 design length 58 km under bharatmala pariyojana in the state of madhya pradesh on hybrid annuity mode
Read moreFour laning of rajapalayam to senkottai section of nh744 from km.107.000 to km. 139.900 (design chainage) under bharatmala pariyojana on ham mode in the state of tamil nadu. (package 2).
Four laning of rajapalayam to senkottai section of nh744 from km.107.000 to km. 139.900 (design chainage) under bharatmala pariyojana on ham mode in the state of tamil nadu. (package 2).
Read more4 laning of rajapalayam to shenkottai sec of nh744 from km 71.600 to km 93.100 dc in tamil nadu on ham (project l21.5km) (packagei)
4 laning of rajapalayam to shenkottai sec of nh744 from km 71.600 to km 93.100 dc in tamil nadu on ham (project l21.5km) (packagei)
Read moreFour laning of kereya to keyondpani section of nh 143d ing from km 28.953 (design chainage) to km 59.300 (design chainage) (length 30.347 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package ii)
Four laning of kereya to keyondpani section of nh 143d ing from km 28.953 (design chainage) to km 59.300 (design chainage) (length 30.347 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package ii)
Read moreFour laning of keyondpani to latra section of nh 143d ing from km 59.300 (design chainage) to km 103.000 (design chainage) (length 43.7 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package iii)
Four laning of keyondpani to latra section of nh 143d ing from km 59.300 (design chainage) to km 103.000 (design chainage) (length 43.7 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package iii)
Read moreFour laning of latra to ranchi (sithiyo) section of nh 143d ing from km 103.000 (design chainage) to km 149.950 (design chainage) (length 46.95 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package iv)
Four laning of latra to ranchi (sithiyo) section of nh 143d ing from km 103.000 (design chainage) to km 149.950 (design chainage) (length 46.95 km) on hybrid annuity mode (ham) under bharatmala pariyojana in jharkhand (package iv)
Read more4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).
4 laning of rajapalayam to shenkottai section of nh-744 from km 71.600 to km 139900 (design chainage) in tamil nadu on hybrid annuity mode (project length68.3km).
Read moreof your Industry type