Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Removal Of Accumulated Earth And Jungle Clearance In Rsd D83 Canal Bed From Eklaspur (V) At Km.35.559 To Khanapur(v) At Km.39.437 Of Manthani (M) (Isd1,Manthani)
|
| Description |
Removal Of Accumulated Earth And Jungle Clearance In Rsb D83 Canal Bed From Eklaspur (V) At Km 35.559 To Khanapur (V) At Km 39.437 Of Manthani (M) (Isd1, Manthani).
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 606522 |
|
Reference Number |
16/2025-26, Dt: 18-06-2025 |
| Tender Fee | 251 |
| EMD | 7063 |
| Tender Value | |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | June 18, 2025 20:30 |
| End Date |
Expired
02/07/2025
Expired 379 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRemoval of accumulated earth jungle clearance from km 19.00 to km 22.200 of minor m22r of d83 main canal jafferkhanpet(v) srirampur (m)
Removal of accumulated earth and jungle clearance from km 19.000 to km 22.200 of minor m-22r of d83 main canal, jafarkhanpet (v) srirampur (m) peddapalli-district.
Read moreRemoval of silt and jungle clearance from 6l of rsb d 83 canal from km 7.065 to km 12.40 near kannala(v), nagaram(v) gunjapadugu(v) of manthini(m), peddapalli(d).
Removal of silt and jungle clearance from 6l of rsb-d83 canal from km 7.065 to km 12.40 near kannala (v), nagaram (v) and gunjapadugu (v) of manthani (m), peddapalli (d).
Read moreRemoval of accumulated silt from canal bed and jungle clerance from km 42.778 of d83 canal to km 9.500 of rsb of d83 canal
Removal of accumulated silt from canal bed and jungle clearance from km 42.778 of d-83 canal to km 9.500 of rsb of d-83 canal.
Read moreJungle clearance and removal of deposited earth on dbm 40 main canal from km0.000 to km.22.500
Jungle clearance and removal of deposited earth on dbm - 40 main canal from km 0.000 to km 22.500
Read moreIcadd - removal of jungle accumulated earth from km.0.000 to km.12.830 on dbm-54 main of kakatiya main canal of srsp stage-ii
Removal of jungle accumulated earth from km.0.000 to km.12.830 on dbm-54 main of kakatiya main canal of srsp stage-ii
Read moreof your Industry type