Wbpw(r)d/Nit 6 Of Se/Whc I/2023 2024/1
Description
Guskara Ausgram Chhoraphari Jungle Road From 0.00 Kmp To 14.00 Km, Strengthening Work Under Asansol Highway Division In The District Of Paschim Bardhaman Under Ridf Xxviii. (2nd Call)
Organisation Government of West Bengal
Tender Id 2023_SH_532974_1
Reference
Number
WBPW(R)D/NIT- 6 of SE/WHC-I/2023-2024
Tender Fee
EMD 10 Lakh
Tender Value
Place Off of the S.E./W.H.C.1/P.W.(R)D.
Link https://wbtenders.gov.in
Start Date June 09, 2023 20:30
End Date

23/06/2023 ( Expired 732 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Read more
Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode

Read more
Wbphed/ee/md/niet_21 (2nd call) of 2025-2026, sl. no.18

Augmentation of boundary wall of head work site of gazole zone-ii pipe water supply scheme at gazole dev. block under malda division, phe dte. in the district of malda. (2nd call)

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Raising strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Raising, strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Read more
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh

Read more
Wbpwd/rds/nit-04 (sl. no.05)/25-26/ee/mhd

Emergent repairing and maintenance work of sabong - mohar road from 8.00 kmp to 12.00 kmp in stretches under midnapore highway division in the district of paschim medinipur. (ch. to non-plan/ rain damage restoration)

Read more
Improvement of road from kamjong to phungyar junction via bhungpa khunou (phase-ii) in kamjong district (l-14.00 km)

Improvement of road from kamjong to phungyar junction via bhungpa khunou (phase-ii) in kamjong district (l-14.00 km).

Read more
Consultancy services for supervision consultant (sc) for operation and maintenance of four lane divided highway from madurai - chettikulam - natham section from km 0.000 to km 36.690 of nh-785 in the state of tamil nadu (2nd call)

Consultancy services for supervision consultant (sc) for operation and maintenance of four lane divided highway from madurai - chettikulam - natham section from km 0.000 to km 36.690 of nh-785 in the state of tamil nadu (2nd call)

Read more
Strengthening from km 0.00 to 13.200 ( majhola to khatima) on nh-731k on epc mode under annual plan 2024-25 in the state of uttarkhand

Strengthening from km 0.00 to 13.200 ( majhola to khatima) on nh-731k on epc mode under annual plan 2024-25 in the state of uttarkhand