Tender Details
Particulars | Details |
---|---|
Title |
Providing Stone Steining In 344 Length On Left Slope Of Ghaggar Rivernear Village Mengra For Making Road Paths Protection Of Agriculture Land Of Village Mengra, Bopur Etc
|
Description |
Providing Stone Steining In 344 Length On Left Slope Of Ghaggar Rivernear&Amp#X0d
Village Mengra For Making Road Paths Protection Of Agriculture Land Of&Amp#X0d
Village Mengra, Bopur Etc.
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_438113_1 |
Reference Number |
2025244360ED C997 466D 8D68 44CD9BAEB7B9113IRR |
Tender Fee | 16180 |
EMD | 2.23 Lakh |
Tender Value | |
Place | DANDOTA MENGRAN |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=515436 |
Start Date | April 03, 2025 17:30 |
End Date |
09/04/2025 ( Expired 41 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreProviding and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Read moreConstr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Constr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreSupply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Supply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Read moreInstallation, testing and commissioning of 11 kv line, distribution transformer, lt line providing for electrification of unelectrified tribal household in village identified under dharti aabha janjatiya gram utkarsh abhiyan dajgua in tikamgarh on
Installation, testing and commissioning of 11 kv line, distribution transformer, lt line providing for electrification of unelectrified tribal household in village identified under dharti aabha janjatiya gram utkarsh abhiyan dajgua in tikamgarh on
Read moreProviding barbed wire fencing to safeguard board properties and to protect the tneb land against unnecessary entry of animals, theft, encroachment by government and private parties etc, for sanctioned 33/11 kv ss at vellalore village, kottanathampaty
Providing barbed wire fencing to safeguard board properties and to protect the tneb land against unnecessary entry of animals, theft, encroachment by government and private parties etc, for sanctioned 33/11 kv ss at vellalore village, kottanathampaty
Read moreReconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Reconstruction and up-gradation to 2lps for the work of junnar - ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length - 55.940 km) in the state of maharashtra on ham.
Read moreFdr of different roads for purba takka tulshi vc, dasarathnagar vc under poang bari rd block under the pwd(randb) satchand division during the year 2024-25
Sh-single bamboo palasiding, removal of land slide,road side protection, providing and placing gunny bags and unlined surface drains etc
Read moreof your Industry type