Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing And Laying And Compaction Of Wbm, Sand Blanketing, Ilcb (M50 Grade) And Casting Of Edge Block In Between Km 0.910 To Km 12.00 On Nelya Dhaula Road For Surfacing Works Under 42 Brtf Of Project Vartak In Arunachal Pradesh
|
Description |
Providing And Laying And Compaction Of Wbm, Sand Blanketing, Ilcb (M50 Grade) And Casting Of Edge Block In Between Km 0.910 To Km 12.00 On Nelya Dhaula Road For Surfacing Works Under 42 Brtf Of Project Vartak In Arunachal Pradesh
|
Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
Tender Id | 2025_BRO_706983_1 |
Reference Number |
CE (P) VTK/NIT/01/2025-26 |
Tender Fee | 0 |
EMD | 13.6 Lakh |
Tender Value | |
Place | BETWEEN KM 0.910 TO KM 12.00 ON NELYA- DHAULA ROAD |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=791875 |
Start Date | May 28, 2025 17:30 |
End Date |
04/06/2025 ( Expired 17 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Read moreSrmd of repair and rehabilitation cable suspension gandhi bridge over siang river loc at km 2.908 on yingkiong moying rd under 105 rcc sector in aor of 761 brtf under project of brahmank in arunachal pradesh
Srmd of repair and rehabilitation cable suspension gandhi bridge over siang river loc at km 2.908 on yingkiong moying rd under 105 rcc sector in aor of 761 brtf under project of brahmank in arunachal pradesh
Read moreMacadamization of road from manohar galla to kassi swari by way of providing and laying wbm grade 2nd 75mm thick in one layer, wbm grade 3rd, 20mm thick premix carpet over 50mm thick bm in km 1st rd 0 to km 2nd rd 200 length 1.2 km
Macadamization of road from manohar galla to kassi swari by way of providing and laying wbm grade 2nd 75mm thick in one layer, wbm grade 3rd, 20mm thick premix carpet over 50mm thick bm in km 1st rd 0 to km 2nd rd 200 length 1.2 km
Read moreConstruction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w
Construction of road from main road mandi phagla buffliaz km 7th to peer fazal shah ziyarat via mohalla kumarah surankote part 1st by way of earth work in cutting,cross drainage,walling, providing and laying of 150 mm thick wbm grade-ii,75mm thick w
Read moreSupply and stacking of stone boulders, smetal 40 mm, schips 20 mm, 10 mm, and sand for pmt works and smetal 63 mm, 45 mm, 26.5 mm, s/chips 13.2 mm, 6.7 mm and sand for surf work for bp-160 between km 0.000 to 10.000 in the state arunachal pradesh
Supply and stacking of stone boulders, smetal 40 mm, schips 20 mm, 10 mm, and sand for pmt works and smetal 63 mm, 45 mm, 26.5 mm, s/chips 13.2 mm, 6.7 mm and sand for surf work for bp-160 between km 0.000 to 10.000 in the state arunachal pradesh
Read moreProviding, laying and compaction of gsb in 150 mm, wmm 75 mm, wmm 100 mm dbm 50 mm, bc 30 mm, fixing of delineators, road stud and road marking complete in all respect all as specified between km 0.000 to 6.884 on road kibithu-thochu-wacha
Providing, laying and compaction of gsb in 150 mm, wmm 75 mm, wmm 100 mm dbm 50 mm, bc 30 mm, fixing of delineators, road stud and road marking complete in all respect all as specified between km 0.000 to 6.884 on road kibithu-thochu-wacha
Read moreBalance work of road from jabri to mohalla bajjarana via pyt bachanwali tehsil surankote district poonch km 1st rd 0 to km 2nd rd 1000 by way of earth work in cutting cross drinage.walling providing and laying 150mm thick wbm grade-ii,75mm thick gr
Balance work of road from jabri to mohalla bajjarana via pyt bachanwali tehsil surankote district poonch km 1st rd 0 to km 2nd rd 1000 by way of earth work in cutting cross drinage.walling providing and laying 150mm thick wbm grade-ii,75mm thick gr
Read moreMtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Mtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Read moreProviding and laying of interlocking paving blocks manufactured from industrial waste including wmm layers between km 40.00 to km 45.00 on road drass-umbala-sanku under 55 rcc/ 762 brtf project vijayak in the union territory of ladakh
Providing and laying of interlocking paving blocks manufactured from industrial waste including wmm layers between km 40.00 to km 45.00 on road drass-umbala-sanku under 55 rcc/ 762 brtf project vijayak in the union territory of ladakh
Read moreSurfacing works including ancillary items on zojila-kargil-leh road between km 429.719 and km 430.00 under 81 rcc/ 16 brtf project vijayak in the union territory of ladakh
Surfacing works including ancillary items on zojila-kargil-leh road between km 429.719 and km 430.00 under 81 rcc/ 16 brtf project vijayak in the union territory of ladakh
Read moreof your Industry type