Tender Details

Particulars Details
Title
Ie Services For Construction Of 4 Lane Gf Sagar Western Bypass From Km 0.000 (Km 181.000 On Nh 146) Near Lahdara Village Junc. On Nh 146 To Km 20.193 (Km 223.200 On Nh 44) Near Berkheri Guru Village Junc. On Nh 44 Of Length 20.193 Km In Mp On Ham
Description
Ie Services For Construction Of 4 Lane Gf Sagar Western Bypass From Km 0.000 (Km 181.000 On Nh 146) Near Lahdara Village Junc. On Nh 146 To Km 20.193 (Km 223.200 On Nh 44) Near Berkheri Guru Village Junc. On Nh 44 Of Length 20.193 Km In Mp On Ham
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 5000
EMD 0
Tender Value
Place NHAI HQ
Link

AAAAAAAAAA

Login to view
Start Date April 09, 2025 17:50
End Date

08/05/2025 ( 18 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Read more
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)

Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.132.320 in dhamasiya village in naswade taluka to ch.161.000 in jitnagar village in nandod taluka (l 28.680 km) section of nh-56 in gujarat on ham (pkg-iv(a)

Read more
Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.161.000 in jitnagar village in nandod taluka to ch.179.780 in bitada-movi village in netrang taluka (l 18.780 km) section of nh-56 in gujarat on ham (pkg-iv)(b)

Upgradation strengthening of 2-4 lane carriageway to 4-lane divided carriageway from ch.161.000 in jitnagar village in nandod taluka to ch.179.780 in bitada-movi village in netrang taluka (l 18.780 km) section of nh-56 in gujarat on ham (pkg-iv)(b)

Read more
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 to km 47.700 (tupudana to kundibartoli) in the state of jharkhand (total length 31.300 km) on hybrid annuity mode.

Widening to 4 lane of nh-20 (old nh-75e) from km 16.400 (design chainage) to km&#x0d 47.700 (design chainage(tupudana to&#x0d kundibartoli) in the state of jharkhand&#x0d (total length 31.300 km) on hybrid annuity&#x0d mode.&#x0d

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Construction of 4-lane with paved shoulder of ferozepur bypass from existing km/design km. 212.500 to existing km 229.690 (design chainage km 231.270) section of nh-354 on epc mode in the state of punjab

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise