Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Reconstruction And Up Gradation To 2 Lps For The Work Of Junnar Ghodegaon Taleghar Road (Nh 61 Spur) From Km 13 880 To Km 69 820 (Design Length 55.940 Km) In The State Of Maharashtra On Ham.
|
Description |
Reconstruction And Up Gradation To 2 Lps For The Work Of Junnar Ghodegaon Taleghar Road (Nh 61 Spur) From Km 13 880 To Km 69 820 (Design Length 55.940 Km) In The State Of Maharashtra On Ham.
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 5.74 Crore |
Tender Value | |
Place | Junnar |
Link |
AAAAAAAAAA Login to view |
Start Date | November 20, 2024 16:30 |
End Date |
10/07/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreConsultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti
Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.
Read moreConsultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Read moreIe services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham
Read moreConsultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh
Read moreRehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).
Read moreRehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).
Rehabilitation and upgradation of armori to gadchiroli section of nh 353c from km 77-900 to 114-800 to four lane standards in the state of maharashtra on ham mode (length -36.900 km).
Read moreRehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of shegaon to maharashtra-mp border section of nh 161g from km 55-000 to km 118-000 (length - 63.00 km) to 2lps configuration in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode
Read moreConstruction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham
Read moreof your Industry type